BLD07-03245
| BLD-Final | 5/9/2008 | 5/9/2008 | 5/9/2008 5:43:02 PM | P | NR |
|
|
rick Note: call for access Phone #: ###-####. needs elec final.
|
BLD08-00093
| BLD-Energy code compliance | 5/9/2008 | 5/9/2008 | 5/9/2008 4:01:25 PM | P | PASS |
|
|
john Phone #: ###-####
|
BLD08-00552
| BLD-Other | 5/9/2008 | 5/9/2008 | 5/9/2008 2:18:32 PM | P | PASS |
|
|
steve Note: ceiling Phone #: ###-####
|
ESC08-00330
| Site Preparation | 5/9/2008 | 5/9/2008 | 5/9/2008 2:18:17 PM | P | PASS |
|
|
|
BLD08-00811
| BLD-Foundation | 5/9/2008 | 5/9/2008 | 5/9/2008 2:18:05 PM | P | PART |
|
|
steve Phone #: ###-####wip.
|
BLD08-00657
| BLD-Footing | 5/8/2008 | 5/9/2008 | 5/9/2008 10:50:49 AM | A | NR |
|
|
eric Phone #: ###-####. Needs Geo-tech insp and letter. Also needs to resolve esc. issues.
|
BLD03-01644
| BLD-Final | 5/8/2008 | 5/9/2008 | 5/9/2008 10:36:35 AM | A | CANC |
|
|
309-cheynne Phone #: ###-####. Rescheduled for Monday in am.
|
BLD07-02455
| BLD-Framing/Rough-in | 5/8/2008 | 5/9/2008 | 5/9/2008 10:19:48 AM | A | PART |
|
|
rob Phone #: ###-####. Ok to rock hardlids at 1st floor ceiling. 1hr. assemblies for exit corridor enclosure has many issues. Noted unprotected openings in ceiling assembly, wall assembly and additional conduit that penetrates exit corridor and does not serve corridor. Also requested UL approved assembly for floor/ceiling assembly at 1hr. corridor, 1st. floor. told contractor not to proceed in this area.
|