FIR10-00137
| INSP-Final Inspection | 5/2/2011 | 5/3/2011 | | A | |
|
|
EARL Phone #: ###-####
|
FIR11-00117
| INSP-Sprinkler Rough-in | 5/9/2011 | 5/9/2011 | 5/12/2011 5:17:56 PM | P | PART |
|
|
|
BLD11-00389
| FIRE-Conference | 5/9/2011 | 5/9/2011 | 5/12/2011 5:17:22 PM | P | DONE |
|
|
|
FIR08-00239
| INSP-Sprinkler Rough-in | 5/9/2011 | 5/9/2011 | 5/9/2011 4:25:00 PM | P | PART |
|
|
Site visit to verify insulation fill at building #3 second floor non-sprinklered eaves (6 locations).
|
FIR10-00293
| FIR-Aging Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 2:53:49 PM | | PEND |
|
|
|
FIR10-00524
| FIR-Aging Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 2:52:36 PM | | PEND |
|
|
Need site inspection request for permit final.
|
BLD10-02149
| FIRE-Final Inspection | 5/5/2011 | 5/9/2011 | 5/9/2011 2:47:02 PM | P | NR |
|
|
Incompleted correction items. Per contractor, hardware issues and a revision to the scope of work are all that remain.
|
FIR11-00108
| INSP-Final Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 2:42:34 PM | P | NR |
|
|
Reference plan review comments dated 3/10/11 regarding the need for a plan modification resubmital approval prior to permit final.
|
BLD10-00623
| FIRE-Conference | 5/9/2011 | 5/9/2011 | 5/9/2011 2:35:37 PM | A | PART |
|
|
Phase work in progress.
|
BLD10-01853
| FIRE-Sprinkler Rough-in | 5/9/2011 | 5/9/2011 | 5/9/2011 2:32:21 PM | A | PART |
|
|
Overhead fire sprinkler work approved for ceiling cover at the 2nd floor computer room.
|
BLD10-00774
| FIRE-Sprinkler Rough-in | 5/9/2011 | 5/9/2011 | 5/9/2011 2:30:24 PM | A | PART |
|
|
Overhead fire sprinkler work okayed for cover.
|
BLD11-00043
| FIRE-Final Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 2:28:51 PM | A | PASS |
|
|
Fire life safety completed satisfactory.
|