ESC10-00687
| Stop Work Order | 5/9/2011 | 5/9/2011 | 5/10/2011 12:00:00 AM | P | DONE |
|
|
|
ESC11-00091
| General Inspection | 5/2/2011 | 5/9/2011 | 5/9/2011 5:17:17 PM | A | PASS |
|
|
|
ESC11-00267
| Site Preparation | 5/9/2011 | 5/9/2011 | 5/9/2011 5:16:00 PM | | NR |
|
|
TOld by contractor that they will not begin the project until the weather begins to dry up and the soil is not so saturated. Expected to begin on the 23rd of May. Will re-inspect on 5/23/2011
|
ESC10-00687
| General Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 3:17:57 PM | | CANC |
|
|
Moved to a Complaint Inspection. STOP WORK ORDER is in place.
|
ESC11-00184
| General Inspection | 5/5/2011 | 5/9/2011 | 5/9/2011 3:17:14 PM | A | FAIL |
|
|
Verbal to RP: Maintain the construction exit inthe subdivision. Will follow up on 11/12/2011AM
|
ESC10-00687
| Complaint Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 2:21:05 PM | P | FAIL |
|
|
STOP WORK ORDER. 1.Clean up all sediment off of all hard sufaces. 2. Sweep up street with a street sweeper, not washed with water. 3. Install sediment barriers along the front perimeter of project. 4. Maintain the storm drain inlet protection. 5. Provide a "Valid" RP that has day to day control over operations in regards with erosion and sediment control. Will release the Stop Work Order once all issues have been corrected.
|
ESC10-00867
| Site Final | 5/4/2011 | 5/9/2011 | 5/9/2011 1:05:46 PM | A | PASS |
|
|
|
ESC11-00117
| Complaint Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 10:46:19 AM | A | PART |
|
|
Verbal to RP: Maintain the construction exit onto Winsong Dr. by adding a top dressing of washed rock on the exsisting rock access.
Contacted the complaintee and expalianed to him that the project has all approved permits with the city and has also filed and Received a receipt of the federal NOI filing. Also explained to him that the construction exit did need tobe maintained and that I have informed the RP that this needs to occur. Will re-inspect on 5/11/2011
|
ESC11-00246
| Site Preparation | 5/4/2011 | 5/9/2011 | 5/9/2011 10:36:45 AM | A | NR |
|
|
Will begin on 5/10/2011. Will inspect on 5/11/2011AM.
|
ESC10-00750
| General Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 10:35:38 AM | | NR |
|
|
RP said waiting on the owner for the start date.
|
ESC10-00472
| General Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 10:32:41 AM | | DONE |
|
|
No activity but still waiting on seed to take and reach a uniformed coverage of the back section of the lot to final out hte permit.
|
ESC10-00896
| General Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 10:30:49 AM | | NR |
|
|
Will re-inspect on 5/13/2011AM for a site preparation inspection.
|
ESC11-00197
| Random Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 9:42:58 AM | A | FAIL |
|
|
Verbal to RP: Prior to the start of any land disturbing activities, you must have a valid ESC permit in the "Issued" status. But you install your BMP's at this time. No other work can occur past the BMP installation.
|
ESC11-00224
| DOC - Permit Finaled | 5/9/2011 | 5/9/2011 | 5/9/2011 9:41:43 AM | P | PASS |
|
|
All work is complete. The construction exit is constructed of washed rock that is a final stabilized method.
|
ESC10-00364
| General Inspection | 5/9/2011 | 5/9/2011 | 5/9/2011 9:32:08 AM | | FAIL |
|
|
Verbal to RP: Provide a washout pit. Clean up all residual throout the front of the project area and place it into the washout pit. Clean up all hasd surfaces of all sediment and debris. Maintain the storm drain on the infront of the project area. WIll re-inspect on 05/11/2011AM.
|