Inspections for the day of: Monday, May 9, 2011.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00687 Stop Work Order5/9/20115/9/20115/10/2011 12:00:00 AMPDONE
ESC11-00091 General Inspection5/2/20115/9/20115/9/2011 5:17:17 PMAPASS
ESC11-00267 Site Preparation5/9/20115/9/20115/9/2011 5:16:00 PM NR
TOld by contractor that they will not begin the project until the weather begins to dry up and the soil is not so saturated. Expected to begin on the 23rd of May. Will re-inspect on 5/23/2011
ESC10-00687 General Inspection5/9/20115/9/20115/9/2011 3:17:57 PM CANC
Moved to a Complaint Inspection. STOP WORK ORDER is in place.
ESC11-00184 General Inspection5/5/20115/9/20115/9/2011 3:17:14 PMAFAIL
Verbal to RP:
Maintain the construction exit inthe subdivision. Will follow up on 11/12/2011AM
ESC10-00687 Complaint Inspection5/9/20115/9/20115/9/2011 2:21:05 PMPFAIL
STOP WORK ORDER.
1.Clean up all sediment off of all hard sufaces.
2. Sweep up street with a street sweeper, not washed with water.
3. Install sediment barriers along the front perimeter of project.
4. Maintain the storm drain inlet protection.
5. Provide a "Valid" RP that has day to day control over operations in regards with erosion and sediment control.
Will release the Stop Work Order once all issues have been corrected.
ESC10-00867 Site Final5/4/20115/9/20115/9/2011 1:05:46 PMAPASS
ESC11-00117 Complaint Inspection5/9/20115/9/20115/9/2011 10:46:19 AMAPART
Verbal to RP:
Maintain the construction exit onto Winsong Dr. by adding a top dressing of washed rock on the exsisting rock access.

Contacted the complaintee and expalianed to him that the project has all approved permits with the city and has also filed and Received a receipt of the federal NOI filing. Also explained to him that the construction exit did need tobe maintained and that I have informed the RP that this needs to occur.
Will re-inspect on 5/11/2011
ESC11-00246 Site Preparation5/4/20115/9/20115/9/2011 10:36:45 AMANR
Will begin on 5/10/2011. Will inspect on 5/11/2011AM.
ESC10-00750 General Inspection5/9/20115/9/20115/9/2011 10:35:38 AM NR
RP said waiting on the owner for the start date.
ESC10-00472 General Inspection5/9/20115/9/20115/9/2011 10:32:41 AM DONE
No activity but still waiting on seed to take and reach a uniformed coverage of the back section of the lot to final out hte permit.
ESC10-00896 General Inspection5/9/20115/9/20115/9/2011 10:30:49 AM NR
Will re-inspect on 5/13/2011AM for a site preparation inspection.
ESC11-00197 Random Inspection5/9/20115/9/20115/9/2011 9:42:58 AMAFAIL
Verbal to RP:
Prior to the start of any land disturbing activities, you must have a valid ESC permit in the "Issued" status. But you install your BMP's at this time. No other work can occur past the BMP installation.
ESC11-00224 DOC - Permit Finaled5/9/20115/9/20115/9/2011 9:41:43 AMPPASS
All work is complete. The construction exit is constructed of washed rock that is a final stabilized method.
ESC10-00364 General Inspection5/9/20115/9/20115/9/2011 9:32:08 AM FAIL
Verbal to RP:
Provide a washout pit. Clean up all residual throout the front of the project area and place it into the washout pit. Clean up all hasd surfaces of all sediment and debris. Maintain the storm drain on the infront of the project area. WIll re-inspect on 05/11/2011AM.