BLD12-00328
| FIRE-Final Inspection | 5/9/2012 | 5/9/2012 | 5/9/2012 3:11:47 PM | P | PASS |
|
|
Fire life safety final approved. Contractor to post signage at the main entry per detail A8.1 prior to structural final as discussed.
|
BLD11-02859
| FIRE-Final Inspection | 5/9/2012 | 5/9/2012 | 5/9/2012 3:09:29 PM | P | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
BLD11-02858
| FIRE-Final Inspection | 5/9/2012 | 5/9/2012 | 5/9/2012 2:54:28 PM | P | PASS |
|
|
Vanilla shell permit work passed life safety inspection.
|
BLD11-02976
| FIRE-Conference | 5/9/2012 | 5/9/2012 | 5/9/2012 2:45:40 PM | P | DONE |
|
|
Project related fire sprinkler permit has been finaled. Need access and plans available on site for life safety final.
|
BLD11-01869
| FIRE-Final Inspection | 5/9/2012 | 5/9/2012 | 5/9/2012 2:42:05 PM | P | PASS |
|
|
Fire life safety finaled. Signature card not available on site.
|
BLD12-00528
| FIRE-Alarm Testing | 5/9/2012 | 5/9/2012 | 5/9/2012 2:40:54 PM | A | PART |
|
|
Project related fire alarm permit in "ready to issue" status.
|
FIR12-00133
| INSP-Sprinkler Rough-in | 5/9/2012 | 5/9/2012 | 5/9/2012 2:39:02 PM | A | PART |
|
|
Main level insulation and cover at walls only approved at this time.
|
FIR11-00496
| INSP-Sprinkler Rough-in/Hydro | 5/8/2012 | 5/9/2012 | 5/9/2012 2:35:50 PM | A | PART |
|
|
2nd floor wet system overhead hydrostatic test passed.
|