Inspections for the day of: Wednesday, May 9, 2012.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-00328 FIRE-Final Inspection5/9/20125/9/20125/9/2012 3:11:47 PMPPASS
Fire life safety final approved. Contractor to post signage at the main entry per detail A8.1 prior to structural final as discussed.
BLD11-02859 FIRE-Final Inspection5/9/20125/9/20125/9/2012 3:09:29 PMPPASS
Fire life safety inspection completed satisfactory.
BLD11-02858 FIRE-Final Inspection5/9/20125/9/20125/9/2012 2:54:28 PMPPASS
Vanilla shell permit work passed life safety inspection.
BLD11-02976 FIRE-Conference5/9/20125/9/20125/9/2012 2:45:40 PMPDONE
Project related fire sprinkler permit has been finaled. Need access and plans available on site for life safety final.
BLD11-01869 FIRE-Final Inspection5/9/20125/9/20125/9/2012 2:42:05 PMPPASS
Fire life safety finaled. Signature card not available on site.
BLD12-00528 FIRE-Alarm Testing5/9/20125/9/20125/9/2012 2:40:54 PMAPART
Project related fire alarm permit in "ready to issue" status.
FIR12-00133 INSP-Sprinkler Rough-in5/9/20125/9/20125/9/2012 2:39:02 PMAPART
Main level insulation and cover at walls only approved at this time.
FIR11-00496 INSP-Sprinkler Rough-in/Hydro5/8/20125/9/20125/9/2012 2:35:50 PMAPART
2nd floor wet system overhead hydrostatic test passed.