FIR12-00059
| INSP-Sprinkler Rough-in/Hydro | 5/9/2012 | 5/9/2012 | 5/9/2012 3:58:12 PM | P | PASS |
|
|
Todays inspection was for multiple hydro tests on the 3rd, 4th, 5th and 6th floors. The hydro tests passed.
|
BLD11-01032
| FIRE-Final Inspection | 5/7/2012 | 5/9/2012 | 5/9/2012 1:15:23 PM | P | PASS |
|
|
Life safety passed
|
FIR12-00113
| INSP-Final Inspection | 5/8/2012 | 5/9/2012 | 5/9/2012 11:26:33 AM | A | CANC |
|
|
I was not contacted prior to the end of my work day that an inspection was wanted for tomorrow. Rescheduled for thursday morning.
|