BLD13-01053
| FIRE-Final Inspection | 5/8/2013 | 5/9/2013 | 5/13/2013 7:33:25 AM | A | FAIL |
|
|
Provide exit signs and EM lighting per plan review red lines, post fire extinguishers with current tags, provide landing at the second exit.
|
FIR13-00148
| INSP-Sprinkler Rough-in | 5/9/2013 | 5/9/2013 | 5/13/2013 7:30:58 AM | A | PART |
|
|
As-builts for field changes at the first floor lobby soffit and grid ceiling areas recieved. Fire sprinkler work in these areas approved for cover.
|
FIR13-00203
| INSP-Final Inspection | 5/8/2013 | 5/9/2013 | 5/10/2013 2:47:49 PM | A | PASS |
|
|
Hood suppression systems functioned correctly under test conditions. Permit final approved.
|
BLD12-00207
| FIRE-Final Inspection | 5/8/2013 | 5/9/2013 | 5/10/2013 6:50:43 AM | A | PASS |
|
|
Previous correction notice items completed. Life safety inspection passed.
|
BLD11-02317
| FIRE-Final Inspection | 5/8/2013 | 5/9/2013 | 5/10/2013 6:48:50 AM | P | PART |
|
|
Third floor remodel work passed fire life safety inspection. One EM light repaired while on site, EM light at the council offices to be replaced.
|