FIR12-00717
| INSP-Final Inspection | 5/9/2014 | 5/9/2014 | 5/9/2014 3:24:38 PM | P | FAIL |
|
|
Not ready for a final inspection. This was a rough-in inspection. See the city approve plans for locations marked "ok" where piping can be covered.
|
FIR13-00639
| INSP-Final Inspection | 5/8/2014 | 5/9/2014 | 5/9/2014 3:06:27 PM | A | PART |
|
|
All corrections have been completed and the forward flush passed. Can not final this permit until possible modifications have been performed due to equipment being installed.
|
BLD13-02271
| FIRE-Final Inspection | 5/8/2014 | 5/9/2014 | 5/9/2014 3:05:22 PM | A | PART |
|
|
A temporary occupancy for life safety is being given until the interior equipmetent has been installed and possible fire sprinkler modifications performed.
|
FIR14-00240
| INSP-Sprinkler Rough-in | 5/8/2014 | 5/9/2014 | 5/9/2014 9:15:58 AM | P | CANC |
|
|
partial rough in Phone #: ###-#### >> Inspection requested via web by John Venche Inspection cancelled from web by: John Venche
|
FIR14-00240
| INSP-Sprinkler Rough-in | 5/8/2014 | 5/9/2014 | 5/8/2014 6:54:08 PM | A | CANC |
|
|
Partial Rough in Phone #: ###-#### >> Inspection requested via web by John Venche Inspection cancelled from web by: John Venche
|