FIR15-00588
| INSP-Sprinkler Rough-in/Hydro | 5/5/2016 | 5/9/2016 | 5/9/2016 12:46:34 PM | P | CANC |
|
|
Spoke to point of contact provided, Colton Phone #: ###-#### , inspection requests were to be cancelled and resheduled for a later date. Cancelling this inspection request based on conversation with point of contact.
|
FIR16-00118
| INSP-Sprinkler Rough-in/Hydro | 5/6/2016 | 5/9/2016 | 5/9/2016 10:56:04 AM | P | PASS |
|
|
200 psi hydrostatic test for overhead fire sprinkler piping located on level 2 complete.
|
FIR16-00212
| INSP-Sprinkler Rough-in | 5/6/2016 | 5/9/2016 | 5/9/2016 9:23:29 AM | P | PART |
|
|
Rough to cover inspection for overhead fire sprinkler located above the hardlids complete, piping above hardlids approved for cover.
|
FIR16-00089
| INSP-Sprinkler Rough-in/Hydro | 5/6/2016 | 5/9/2016 | 5/9/2016 8:33:29 AM | A | CANC |
|
|
Inspection request cancelled per coversation with point of contact on project. Rough-in/Hydro request will be rescheduled to coincide with early morning main line flush.
|