ESC14-00572
| General Inspection | 5/9/2016 | 5/9/2016 | 5/11/2016 10:15:58 AM | | PASS |
|
|
Wattles to remain installed. Homeowner to remove stakes when ready.
|
ESC15-01487
| General Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 4:10:06 PM | P | PASS |
|
|
WIP on foundation. Permit sign posted, DI on Fairview has inlet sediment bag installed.
|
ESC14-00594
| Aging Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 3:41:49 PM | | PASS |
|
|
Vertical construction in progress. Perimeter sediment controls, track out control construction entrance in good condition. Street and gutter are free of loose dirt. No corrections.
|
ESC14-00593
| Aging Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 3:41:39 PM | | PASS |
|
|
Vertical construction in progress. Perimeter sediment controls, track out control construction entrance in good condition. Street and gutter are free of loose dirt. No corrections.
|
ESC14-00592
| Aging Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 3:41:28 PM | | PASS |
|
|
Vertical construction in progress. Perimeter sediment controls, track out control construction entrance in good condition. Street and gutter are free of loose dirt. No corrections.
|
ESC14-00591
| Aging Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 3:41:13 PM | | PASS |
|
|
Vertical construction in progress. Perimeter sediment controls, track out control construction entrance in good condition. Street and gutter are free of loose dirt. No corrections.
|
ESC16-00146
| Site Preparation | 5/9/2016 | 5/9/2016 | 5/9/2016 3:03:57 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted. Subdivision BMPs installed. Approved.
|
ESC03-01026
| DOC - Permit Finaled | 5/9/2016 | 5/9/2016 | 5/9/2016 2:44:54 PM | P | PASS |
|
|
expired permit open in system closed out
|
ESC14-00678
| DOC - Permit Finaled | 5/9/2016 | 5/9/2016 | 5/9/2016 1:14:45 PM | P | PASS |
|
|
|
ESC15-00849
| DOC - Permit Finaled | 5/9/2016 | 5/9/2016 | 5/9/2016 1:14:36 PM | P | PASS |
|
|
|
ESC16-00215
| General Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 12:43:01 PM | A | FAIL |
|
|
Sediment runoff and mud from site has accumulated in the gutter on the south side of Sloan Street bordering the project.
No ESC inspections logged in the inspection on site, no construction entrance installed as listed in ESC plan.
Issued corrections to sweep and change DI bags to onsite supervisor for Diamond, Sam.
|
ESC15-00031
| BMP Violation | 5/9/2016 | 5/9/2016 | 5/9/2016 11:47:58 AM | A | FAIL |
|
|
No lined concrete washout provided.
Correction request to builders and developer to provide a lined and designated concrete washout pit.
Check storm drain inlets for DI bag maintenance.
|
ESC16-00158
| Random Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 11:45:13 AM | P | FAIL |
|
|
Sediment runoff from unstabilized lots to street.
Correction notice to CBH to clean up 4 new homes on north side of Sloan Street and conduct maintenance on DI bag
|
ESC16-00341
| BMP Violation | 5/9/2016 | 5/9/2016 | 5/9/2016 11:43:59 AM | P | FAIL |
|
|
Verbal correction request to RP Greg:
- sweep up and contain stockpile of backfill dirt that was carried off site over weekend - conduct maintenance on DI bag - re-post ESC permit sign - do not use non-compliant washout that has started at north end of Sunglow
RP agreed. Will check back Wednesday for corrections.
|
ESC16-00454
| Site Preparation | 5/6/2016 | 5/9/2016 | 5/9/2016 10:56:57 AM | A | PASS |
|
|
Dave Phone #: ###-####
Permit sign posted. Flat lot in new sub. Need to use a lined concrete washout for Canyon Crest Homes; subdivision is under correction notice to provide a lined washout and clean up mess at north end of Sunglow.
|
ESC16-00451
| Site Preparation | 5/6/2016 | 5/9/2016 | 5/9/2016 10:56:43 AM | A | PASS |
|
|
Dave Phone #: ###-####
Permit sign posted. Flat lot in new sub. Need to use a lined concrete washout for Canyon Crest Homes; subdivision is under correction notice to provide a lined washout and clean up mess at north end of Sunglow.
|
ESC15-00562
| General Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 10:37:10 AM | | PASS |
|
|
Project complete. All permits finaled.
No offsite drainage, no sediment leaving site. Some minor areas remain to be landscaped. No further ESC inspections. Sto
|
ESC15-00562
| DOC - Permit Finaled | 5/9/2016 | 5/9/2016 | 5/9/2016 10:36:10 AM | P | PASS |
|
|
|
ESC16-00156
| General Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 10:15:05 AM | A | FAIL |
|
|
Sheet flow from weekend thunderstorms has carried lots of sediment and dirt on the streets of both phases of Peppermill.
CBH homes also source of lot of runoff.
Corrections needed: - clean out DI bags on Hollandale outside of the sub and sweep gutter. - sweep streets when wind has decreased. - get water truck on site. - do maintenance on all DIs in Peppermill.
Corrections issued to Trilogy and CBH
|
ESC13-01159
| General Inspection | 5/9/2016 | 5/9/2016 | 5/9/2016 10:14:51 AM | | FAIL |
|
|
Sheet flow from weekend thunderstorms has carried lots of sediment and dirt on the streets of both phases of Peppermill.
CBH homes also source of lot of runoff.
Corrections needed: - clean out DI bags on Hollandale outside of the sub and sweep gutter. - sweep streets when wind has decreased. - get water truck on site. - do maintenance on all DIs in Peppermill.
Corrections issued to Trilogy and CBH
|
ESC16-00519
| Site Preparation | 5/6/2016 | 5/9/2016 | 5/9/2016 9:10:21 AM | A | PASS |
|
|
Justin Phone #: ###-####
Flat lot with minimal excavation within existing private senior community. Boise Building Co. sites within development are in compliance. Approved for construction.
|