BLD16-02421
| BLD-Foundation | 5/8/2017 | 5/9/2017 | 5/9/2017 3:57:12 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD16-03892
| BLD-Framing/Rough-in | 5/9/2017 | 5/9/2017 | 5/9/2017 3:31:12 PM | P | FAIL |
|
|
c/n provide headers requred for return air wall penatrations not on plan for load and deflection// need engenery report to verrify exterior foam insulation.
|
BLD17-01167
| BLD-Final | 5/9/2017 | 5/9/2017 | 5/9/2017 2:38:03 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ira Rutledge
|
BLD17-01167
| DOC - Permit Finaled | 5/9/2017 | 5/9/2017 | 5/9/2017 2:37:38 PM | P | PASS |
|
|
|
BLD16-00696
| BLD-Final | 5/9/2017 | 5/9/2017 | 5/9/2017 2:16:11 PM | P | FAIL |
|
|
Michael Phone #: ###-####. Please Christina w/status vault removal and three locations concrete wash outs with out containement
|
BLD16-03779
| BLD-Final | 5/9/2017 | 5/9/2017 | 5/9/2017 1:51:22 PM | P | PASS |
|
|
Matt-please call prior for access Phone #: ###-####
|
BLD16-03779
| DOC - Permit Finaled | 5/9/2017 | 5/9/2017 | 5/9/2017 1:51:02 PM | P | PASS |
|
|
|
MIS17-00028
| MIS-Aging Inspection | 5/9/2017 | 5/9/2017 | 5/9/2017 11:40:08 AM | | PART |
|
|
bld17 under review
|
BLD16-02288
| BLD-Aging Inspection | 5/9/2017 | 5/9/2017 | 5/9/2017 11:38:20 AM | | PASS |
|
|
pending ele insp
|
MIS15-00278
| MIS-Aging Inspection | 5/9/2017 | 5/9/2017 | 5/9/2017 11:36:51 AM | | FAIL |
|
|
admin issues//Expired (TRINITY TRAILER MANUFACTURING - Bldg #1) Permit for the construction of a new 3,800 sq. ft. two story office building with 2,050 on the first story and 1,750 sq. ft. on the second story. The first story consists of a break room accessible restrooms and a parts room area. the second story consists of restroom and office area. The building is not fire sprinklered. The new building is approximately 6 feet from an existing 16,500 sq. ft. F-2 manufactuting building and is considered one building. The enclosed stairs a the north end of the building are not required to be rated as 50% of the exits from the second story are allowed to be at unenclosed stairways per section 1016.1 #2. CDM BLD13-02214 Expired (TRINITY TRAILER MANUFACTURING - Bldg #2) Permit for the construction of a new 3,400 sq. ft. two story office building with 1,850 sq. ft. on the first story and 1,550 on the second story. The first story consists of a break room, accessible restrooms and a parts room. The second story consists of office area and one restroom. This building is not fire sprinklered. The new building is being placed 8' away from an existing 18,750 sq. ft. F-1 manufacturing building. The two buildings have been calculated as one building for height and area. The enclosed stairs a the north end of the building are not required to be rated as 50% of the exits from the second story are allowed to be at unenclosed stairways per section 1016.1 #2. CDM BLD16-01532 Under Review **see attached ACHD***(TRINITY TRAILERS - Detached accessory Membrane Structures) Permit to construct three membrane structures on an existing lot. Each structure is approximatly 2,520 square feet creating a combined square feet of 7,560. Note: these structures were permitted without a permit and are now going through the process to permit these as new structures. **TLW** BLD16-03301 Received **see attached ACHD***(TRINITY TRAILERS - Detached accessory Membrane Structures) Permit to construct three membrane structures on an existing lot. Each structure is approximatly 2,520 square feet creating a combined square feet of 7,560. Note: these structures were permitted without a permit and are now going through the process to permit these as new structures. **TLW** BLD16-03302 Under Review **see attached ACHD***(TRINITY TRAILERS - Detached accessory Membrane Structures) Permit to construct three membrane structures on an existing lot. Each structure is approximatly 2,520 square feet creating a combined square feet of 7,560. Note: these structures were permitted without a permit and are now going through the process to permit these as new structures. **TLW**
|
BLD17-00678
| BLD-Wall Bracing | 5/8/2017 | 5/9/2017 | 5/9/2017 11:34:07 AM | A | PASS |
|
|
Bob Phone #: ###-####
|
BLD17-01128
| BLD-Framing/Rough-in | 5/8/2017 | 5/9/2017 | 5/9/2017 11:33:32 AM | A | PASS |
|
|
please call Shay at ###-#### 30 minutes before arrival to gain access if you could . Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD17-00618
| BLD-Footing | 5/8/2017 | 5/9/2017 | 5/9/2017 11:23:43 AM | A | PASS |
|
|
Ben Kelly Phone #: ###-####
|
BLD16-03989
| BLD-Wall Bracing | 5/8/2017 | 5/9/2017 | 5/9/2017 10:02:31 AM | A | PART |
|
|
Jim, I apologize that the framer wasn''t ready for sheer. He is who asked me to contact you Friday. He called me an hour ago or so asking for it (again). He is ready this afternoon but, it is late in the day! I left a message on your phone, please call me with comments. Danny Phone #: ###-#### Inspection requested via web by Danny Utterbeck back of house need engineering/ fire wall in garage not built corect.
|
BLD17-00833
| BLD-Footing | 5/8/2017 | 5/9/2017 | 5/9/2017 9:32:36 AM | A | PASS |
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo lira
|