FIR17-00080
| INSP-Sprinkler Rough-in | 5/9/2017 | 5/9/2017 | 5/9/2017 11:35:53 AM | P | PASS |
|
|
The remaining tenting is complete for the north half of the building and the piping can be covered. The new canopy at the south end of the building still needs inspected when built.
|
FIR17-00115
| INSP-Final Inspection | 5/8/2017 | 5/9/2017 | 5/9/2017 10:34:17 AM | A | PASS |
|
|
Rough-in passed for the remaining sprinkler piping. Piping can be covered.
|
FIR17-00002
| INSP-Sprinkler Rough-in/Hydro | 5/8/2017 | 5/9/2017 | 5/9/2017 9:22:20 AM | A | CANC |
|
|
Cancel per John Beazer due to leak found after start of test
|
FIR17-00088
| INSP-Sprinkler Rough-in | 5/8/2017 | 5/9/2017 | 5/9/2017 8:51:21 AM | A | PASS |
|
|
Rough-in passed piping can be covered.
|
BLD17-00392
| FIRE-Final Inspection | 5/8/2017 | 5/9/2017 | 5/9/2017 8:50:48 AM | A | FAIL |
|
|
Need project related fire sprinkler permit called in, need fire review comments, need verification that the smoke evac engineering is not required. Burt Phone #: ###-####
|
BLD17-01215
| FIRE-Final Inspection | 5/8/2017 | 5/9/2017 | 5/8/2017 2:58:40 PM | A | PASS |
|
|
life safety passed
|