Inspections for the day of: Tuesday, May 9, 2017.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-03770 BLD-Wall Bracing5/9/20175/9/20175/9/2017 4:36:39 PMPPASS
Shear // Joe Phone #: ###-####
BLD17-00670 BLD-Foundation5/9/20175/9/20175/9/2017 4:36:19 PMPPASS
BLD17-00781 BLD-Wall Bracing5/9/20175/9/20175/9/2017 3:46:16 PMPPASS
Shear // Zane Phone #: ###-####
BLD17-00760 BLD-Wall Bracing5/9/20175/9/20175/9/2017 3:12:43 PMPPART
Shear // Zane Phone #: ###-####
No access to second floor. 3 OSB interior walls to ready at time of inspection, exterior only.
BLD17-01074 BLD-Framing/Rough-in5/8/20175/9/20175/9/2017 2:48:26 PMPPASS
Cole Phone #: ###-####
BLD16-02316 BLD-Foundation5/9/20175/9/20175/9/2017 1:43:46 PMPPASS
Justin Phone #: ###-####
Conference with builder, all remaining hold downs in place, foundation (mud room/kitchen area) was poured in phases. Last phase was poured without inspection. OK to call for wall bracing inspection.
BLD16-04306 BLD-Energy code compliance5/8/20175/9/20175/9/2017 12:54:56 PMAPASS
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD16-04156 BLD-Framing/Rough-in5/8/20175/9/20175/9/2017 12:54:36 PMAPASS
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD16-01894 BLD-Final5/8/20175/9/20175/9/2017 11:35:08 AMAPASS
Eric Phone #: ###-####
BLD16-01894 DOC - Permit Finaled5/9/20175/9/20175/9/2017 11:34:53 AMPPASS