BLD16-03770
| BLD-Wall Bracing | 5/9/2017 | 5/9/2017 | 5/9/2017 4:36:39 PM | P | PASS |
|
|
Shear // Joe Phone #: ###-####
|
BLD17-00670
| BLD-Foundation | 5/9/2017 | 5/9/2017 | 5/9/2017 4:36:19 PM | P | PASS |
|
|
|
BLD17-00781
| BLD-Wall Bracing | 5/9/2017 | 5/9/2017 | 5/9/2017 3:46:16 PM | P | PASS |
|
|
Shear // Zane Phone #: ###-####
|
BLD17-00760
| BLD-Wall Bracing | 5/9/2017 | 5/9/2017 | 5/9/2017 3:12:43 PM | P | PART |
|
|
Shear // Zane Phone #: ###-#### No access to second floor. 3 OSB interior walls to ready at time of inspection, exterior only.
|
BLD17-01074
| BLD-Framing/Rough-in | 5/8/2017 | 5/9/2017 | 5/9/2017 2:48:26 PM | P | PASS |
|
|
Cole Phone #: ###-####
|
BLD16-02316
| BLD-Foundation | 5/9/2017 | 5/9/2017 | 5/9/2017 1:43:46 PM | P | PASS |
|
|
Justin Phone #: ###-#### Conference with builder, all remaining hold downs in place, foundation (mud room/kitchen area) was poured in phases. Last phase was poured without inspection. OK to call for wall bracing inspection.
|
BLD16-04306
| BLD-Energy code compliance | 5/8/2017 | 5/9/2017 | 5/9/2017 12:54:56 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD16-04156
| BLD-Framing/Rough-in | 5/8/2017 | 5/9/2017 | 5/9/2017 12:54:36 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD16-01894
| BLD-Final | 5/8/2017 | 5/9/2017 | 5/9/2017 11:35:08 AM | A | PASS |
|
|
Eric Phone #: ###-####
|
BLD16-01894
| DOC - Permit Finaled | 5/9/2017 | 5/9/2017 | 5/9/2017 11:34:53 AM | P | PASS |
|
|
|