ESC16-00286 Aging Inspection5/9/20175/9/20175/10/2017 4:09:04 PM CANC
ESC15-01004 General Inspection5/9/20175/9/20175/10/2017 4:08:48 PM PASS
Drop inlet protection installed. No trackout, no discharges or loose materials observed. Exterior site work and interior work in progress. No corections requested.
ESC16-00551 Aging Inspection5/9/20175/9/20175/10/2017 7:40:49 AM CANC
ESC16-00626 Aging Inspection5/9/20175/9/20175/10/2017 7:40:33 AM CANC
ESC15-00853 General Inspection5/9/20175/9/20175/9/2017 3:06:02 PM PASS
No trackout or discharges within subdivsion on Hill Terrace nor to Hill Road.. Trash containment in good condition. No new corrections.
ESC16-00319 General Inspection5/9/20175/9/20175/9/2017 3:05:14 PM PEND
ESC17-00426 General Inspection5/9/20175/9/20175/9/2017 12:12:01 PMPPART
WIP on road grading and underground utility installation. No fugitive dust at time of inspection, water truck onsite but not in use.

Permit sign posted and construction entrance installed. Workers and equipment are driving around construction entrance and there is some dusty trackout to Saxton that needs sweeping. No NOI/SWPPP info posting observed.

Verbal correction request to Ed to provide sweeping or install a wider rock entrance to a designated parking/and staging area.
ESC16-01487 Site Final5/9/20175/9/20175/9/2017 11:59:58 AMPPASS
Demolition complete, ESC permit finaled. Parcel now part of Millwell Park subdivision phase 2, see ESC17-00426
ESC16-01489 Site Final5/9/20175/9/20175/9/2017 11:59:40 AMPPASS
Demolition complete, ESC permit finaled. Parcel now part of Millwell Park subdivision phase 2, see ESC17-00426
ESC16-00055 Site Final5/9/20175/9/20175/9/2017 11:54:48 AMPPEND
Need to remove ESC permit signs on completed projects and remove DI bags in storm drains that received runoff from Tahoe Homes lots on Baron and Township.
ESC16-01651 General Inspection5/9/20175/9/20175/9/2017 11:43:44 AMPPASS
No new activity. Undergound sewer and utlitiy work is complete but no roads or gutters yet. Permit and SWPPP info posted at rock construction entrance. Perimeter control wattle installed along contruction limits in between canal. There are some large unprotected stockpiles on site that should be stabilized/ flattened to prevent fugitive dust issues. Will check on status in 2 weeks.
ESC16-01370 General Inspection5/9/20175/9/20175/9/2017 11:21:14 AMPPASS
WIP on exterior finish. Permit sign posted, trash contained. No trackout/discharges observed. Receiving MS4 has had new inlet protection installed as requested. Approved.
ESC16-00770 General Inspection5/9/20175/9/20175/9/2017 11:20:43 AMPPASS
No activity at time of inspeciton. Exterior site work and landscaping is still in progress. Driveway is now complete. Silt fence and inlet protection BMPs are installed. No violations observed.
ESC16-00788 General Inspection5/9/20175/9/20175/9/2017 11:14:25 AMPPASS
Home is complete, but yard has not been cleaned up or landscaped with temp BMPs. No trackout or sediment runoff observed. Site should be landscaped soon

The MS4 inlet downhill on Quail Hollow has been replaced as requested in April of both projects (adjacent).
ESC16-00290 Aging Inspection5/9/20175/9/20175/9/2017 10:33:42 AM CANC