PLM18-00842
| Final | 5/9/2018 | 5/9/2018 | 5/9/2018 4:51:07 PM | P | PASS |
|
|
|
PLM18-00498
| Plumbing Rough-in | 5/8/2018 | 5/9/2018 | 5/9/2018 4:33:52 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
PLM18-00497
| Plumbing Rough-in | 5/8/2018 | 5/9/2018 | 5/9/2018 4:33:34 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. Hang the 3" pipe in the overhead
|
PLM17-03246
| PLM-Aging Inspection | 5/9/2018 | 5/9/2018 | 5/9/2018 4:10:45 PM | | PASS |
|
|
|
PLM17-03246
| DOC - Permit Finaled | 5/9/2018 | 5/9/2018 | 5/9/2018 4:10:35 PM | P | PASS |
|
|
|
PLM18-01920
| Plumbing Rough-in | 5/9/2018 | 5/9/2018 | 5/9/2018 4:03:01 PM | P | PASS |
|
|
Dan, if possible, please come after 3. THANK YOU! Phone #: ###-#### Inspection requested via web by Tom Maxwell. 60psi test ok and dwv ok. gas sleeve in the wall shall be sealed in the wall and vented to outside of the wall. -building permit not issued yet
|
PLM18-01917
| Plumbing Rough-in | 5/9/2018 | 5/9/2018 | 5/9/2018 2:39:43 PM | P | PASS |
|
|
Later in the afternoon would be great, thanks Phone #: ###-#### Inspection requested via web by Todd Walter
|
PLM18-01918
| Plumbing Rough-in | 5/9/2018 | 5/9/2018 | 5/9/2018 2:37:14 PM | P | PASS |
|
|
Later in the afternoon would be great, thanks. Phone #: ###-#### Inspection requested via web by Todd Walter
|
PLM18-01907
| Water and/or Sewer | 5/9/2018 | 5/9/2018 | 5/9/2018 2:10:51 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Charles Parks. OK to cover. PVB needs certified
|
PLM18-01879
| Groundwork | 5/8/2018 | 5/9/2018 | 5/9/2018 1:58:17 PM | P | PASS |
|
|
HENRY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
PLM18-01863
| Final | 5/8/2018 | 5/9/2018 | 5/9/2018 1:28:35 PM | P | FAIL |
|
|
Brian Scoles is scheduled to do pm HVAC final inspection. Call Brenda @ ###-#### before going to inspection Inspection requested via web by Sharon Afinson. Need to pressure test the flue.
|
PLM17-03677
| Final | 5/9/2018 | 5/9/2018 | 5/9/2018 1:17:10 PM | P | FAIL |
|
|
1. Add PRV and new fixtures to the permit value. 2. Provide and air-gap for the water softener drain
|
PLM18-01484
| Plumbing Rough-in | 5/9/2018 | 5/9/2018 | 5/9/2018 12:43:00 PM | P | CANC |
|
|
Andrew Phone #: ###-####. Need a valid Contractors license.
|
PLM17-02874
| Final | 5/8/2018 | 5/9/2018 | 5/9/2018 10:25:40 AM | A | PASS |
|
|
Please call ###-#### when on way. Phone #: ###-#### Inspection requested via web by JEREMY LINK
|
PLM18-01869
| Water and/or Sewer | 5/8/2018 | 5/9/2018 | 5/9/2018 10:08:01 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brett Simmons. Exspose the water service and put under a pressure test.
|
PLM18-01870
| Water and/or Sewer | 5/8/2018 | 5/9/2018 | 5/9/2018 10:07:07 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Brett Simmons. Expose the water service and put under test.
|
PLM18-01891
| Final | 5/8/2018 | 5/9/2018 | 5/9/2018 9:49:05 AM | A | PASS |
|
|
Daniel-block and tie Phone #: ###-####
|
PLM18-01830
| Water Heater Final | 5/4/2018 | 5/9/2018 | 5/9/2018 9:27:48 AM | A | PASS |
|
|
Karen Early. Please call with 20 minute lead ###-#### Phone #: ###-#### Inspection requested via web by Heidi Lukecart
|
PLM18-01810
| Water Heater Final | 5/3/2018 | 5/9/2018 | 5/9/2018 9:12:05 AM | A | PASS |
|
|
call morgan ###-#### to be let in Phone #: ###-#### Inspection requested via web by Vaughn Carlson
|
PLM18-00842
| Final | 5/8/2018 | 5/9/2018 | 5/9/2018 8:53:29 AM | A | FAIL |
|
|
Juan-please call for access Phone #: ###-####. The vent for the oil/fuel separator must vent out the roor on it's own. Add a hose bibb vacuum breaker to the hose bibb. Lower the t&p drain below the faucet and leave an 1-1/2" air gap.
|
PLM18-01062
| Final | 5/8/2018 | 5/9/2018 | 5/8/2018 4:33:08 PM | A | PASS |
|
|
call if questions. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM18-01665
| Sprinkler (Final) | 5/8/2018 | 5/9/2018 | 5/8/2018 4:20:14 PM | A | PASS |
|
|
Lacey Phone #: ###-####
|
PLM18-01847
| Final | 5/8/2018 | 5/9/2018 | 5/8/2018 11:14:52 AM | P | CANC |
|
|
PM. Please call technician when on way: Maddie ###-#### Phone #: ###-#### >> Inspection requested via web by Krista Boss Inspection cancelled from web by: Krista Boss
|