ELE18-01858
| Electrical Rough-In | 5/9/2019 | 5/9/2019 | 5/9/2019 2:43:09 PM | P | PASS |
|
|
Bike shop wall cover lights and outlets Phone #: ###-#### Inspection requested via web by cris flores Area listed ok to cover
|
ELE19-01712
| Electrical Rough-In | 5/9/2019 | 5/9/2019 | 5/9/2019 2:35:07 PM | P | PASS |
|
|
Rough-in inspection for walls. Phone #: ###-#### Inspection requested via web by Bryan Atkins Storage, Restroom and demizing wall
|
ELE19-00042
| Conference | 5/9/2019 | 5/9/2019 | 5/9/2019 2:04:48 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Don Conley Talked about recep location over kitchen countertop to the left of cook top. Will put in plug mold on underside of cabinet.
|
ELE19-01589
| Electrical Rough-In | 5/8/2019 | 5/9/2019 | 5/9/2019 1:50:58 PM | P | PASS |
|
|
Remodel for kitchen, matr bath, fireplace wall Phone #: ###-#### Inspection requested via web by Emmet Bushman Kitchen, Main bath, Living FP wall. Master bed Back wall, Master bath and closet, Office half wall. Ok to cover
|
ELE19-01484
| Rough-In Permanent Service | 5/7/2019 | 5/9/2019 | 5/9/2019 1:25:31 PM | P | NR |
|
|
2:30- 3pm this job will be ready. Please contact Barry Spencer: ###-#### Phone #: ###-#### Inspection requested via web by Rob Maes
|
ELE19-01674
| Permanent Service | 5/9/2019 | 5/9/2019 | 5/9/2019 1:04:55 PM | P | PASS |
|
|
Joshua ###-#### p/s u/g rec ok
|
ELE19-01673
| Permanent Service | 5/9/2019 | 5/9/2019 | 5/9/2019 1:04:35 PM | P | PASS |
|
|
Joshua Phone #: ###-#### p/s u/g rec ok
|
ELE19-01672
| Permanent Service | 5/9/2019 | 5/9/2019 | 5/9/2019 1:04:15 PM | P | PASS |
|
|
Joshua Phone #: ###-#### p/s u/g rec ok
|
ELE18-04438
| Final | 5/8/2019 | 5/9/2019 | 5/9/2019 11:35:17 AM | A | PASS |
|
|
key is at front door under a block of wood Phone #: ###-#### Inspection requested via web by Neal Rumsey Corrections made final ok
|
ELE19-01707
| Electrical Rough-In | 5/8/2019 | 5/9/2019 | 5/9/2019 10:16:29 AM | A | PASS |
|
|
Builder will be on site Phone #: ###-#### Inspection requested via web by steve sellers Make sure blank cover is on metal J box above mudroom door at final Kitchen, Mudroom, Laundry ok to cover
|
ELE19-01675
| Final | 5/8/2019 | 5/9/2019 | 5/9/2019 9:58:00 AM | A | NR |
|
|
Please contact Steve Nuxoll with any questions. Thank you ; have a nice day! Phone #: ###-#### Inspection requested via web by JENNY EMEL Coordinate with solar installer and recall final
|
ELE19-01554
| Final | 5/8/2019 | 5/9/2019 | 5/9/2019 9:57:22 AM | A | NR |
|
|
Please call before inspection Phone #: ###-#### Inspection requested via web by Matt Oranday Cooridinate with electrician and recall final
|
ELE19-01656
| Rough-In Permanent Service | 5/8/2019 | 5/9/2019 | 5/9/2019 9:45:08 AM | A | PASS |
|
|
Interior rough and perminent service exclude sophet will call in for sophet inspection Phone #: ###-#### Inspection requested via web by Ryan Wake Do not cover soffits WUI zone A requirments. Rough in ok p/s u/g n ok
|
ELE19-01558
| Electrical Rough-In | 5/7/2019 | 5/9/2019 | 5/9/2019 9:26:16 AM | A | PASS |
|
|
If possible, please call the number above when headed to the jobsite. Thank you! Phone #: ###-#### Inspection requested via web by BRS Permitting listing only ok
|
ELE17-01467
| Final | 5/6/2019 | 5/9/2019 | 5/9/2019 9:02:16 AM | A | PASS |
|
|
9 am if possible Phone #: ###-#### Inspection requested via web by Christophe Keys Corrections made Final ok
|
ELE19-01686
| Electrical Rough-In | 5/8/2019 | 5/9/2019 | 5/9/2019 8:20:15 AM | A | PASS |
|
|
Electrical rough-in for new wall. Phone #: ###-#### Inspection requested via web by Kevin Perez 2 receps and a switch in new wall Deviding back area from front. ok to cover
|