Inspections for the day of: Thursday, May 9, 2019.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE14-02852 ELE-Aging Inspection5/9/20195/9/20195/17/2019 5:58:30 AM DONE
Please coordinate time to conduct a final inspection.
ELE19-00853 Rough-In Permanent Service5/9/20195/9/20195/9/2019 2:54:31 PMPPASS
Phone #: ###-#### Inspection requested via web by Therrin Robertson p/s o/h n ok
ELE19-01590 Rough-In Permanent Service5/8/20195/9/20195/9/2019 2:38:48 PMPPASS
This is for house only Phone #: ###-#### Inspection requested via web by Emmet Bushman Cover house only. p/s o/h n ok
ELE19-00560 Electrical Rough-In5/9/20195/9/20195/9/2019 2:24:10 PMPPASS
This is for rough Electrical in walls and hard lid. Please call when in route for lockbox code or so that someone can be on-site. Phone #: ###-#### Inspection requested via web by Cortney Hopper Ok cover lower level walls/hard lid, U shaped half wall upstairs to the right.
ELE18-04302 Final5/9/20195/9/20195/9/2019 1:32:13 PMPNR
garage code 0555 Phone #: ###-#### Inspection requested via web by Jay Hutchison
ELE19-01408 Electrical Rough-In5/9/20195/9/20195/9/2019 1:19:42 PMPPASS
Call Eric w/any questions ###-#### Phone #: ###-#### Inspection requested via web by Bonnie Page Ok cover areas listed.
ELE19-01709 Permanent Service5/9/20195/9/20195/9/2019 12:47:43 PMPPASS
Need new service okay to energize so existing service can be demoed and removed. Should be done by 12:30 pm with new service. Phone #: ###-#### Inspection requested via web by Monty Adkinson New service location on NE corner. Overhead mast is stabilized. Existing overhead drop needs to be moved in order to due addition. p/s o/h n ok
ELE19-01704 Final5/8/20195/9/20195/9/2019 12:45:34 PMAPASS
Phone #: ###-#### Inspection requested via web by Ryan Wilson Ok final. Max fuse 25, 2pole 20 installed.
ELE19-01696 Temporary Service5/8/20195/9/20195/9/2019 12:16:20 PMAPASS
thx Phone #: ###-#### Inspection requested via web by Stephen Kren t/s o/h n ok
ELE19-00667 Electrical Rough-In5/8/20195/9/20195/9/2019 11:59:52 AMPPASS
Underground Cover. Von is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Ok cover grd work for bakery
ELE19-01493 Electrical Rough-In5/8/20195/9/20195/9/2019 10:57:53 AMAPASS
Pad Underground Inspection Quinn''s pond
Please call mike when entering the park. Phone #: ###-#### Inspection requested via web by Tye Thomas Ok cover pad for compressors to run aeration equipt on NW corner of Quinns Pond.
ELE19-01669 Conference5/7/20195/9/20195/9/2019 10:56:14 AMADONE
Milenko Phone #: ###-#### Discussed service location for ADU
ELE19-01429 Final5/8/20195/9/20195/9/2019 10:55:51 AMAPASS
Phone #: ###-#### Inspection requested via web by David Nelson Ok final.
ELE17-04235 Final5/6/20195/9/20195/9/2019 10:55:33 AMACANC
Phone #: ###-#### Inspection requested via web by Rachel Wilson Re-scheduled for 5/10
ELE19-01410 Electrical Rough-In5/8/20195/9/20195/9/2019 9:22:24 AMAPASS
Partial rough in room #''s 107 / 108 / 109 / 111 / 112 Phone #: ###-#### Inspection requested via web by jamie berg Ok cover areas listed. Ceilings over 7-1/2 ft.
ELE19-01557 Electrical Rough-In5/8/20195/9/20195/9/2019 9:03:20 AMAPASS
rough cover ready Phone #: ###-#### Inspection requested via web by Matthew White Ok cover. 2-outlets, and 1 floor outlet will need to be installed on N wall upstairs. Not classified as hallway on prints, and all areas are more than 2 ft. Will need to see on final.
ELE19-01371 Permanent Service5/8/20195/9/20195/9/2019 8:31:38 AMAPASS
Access through back Alley . Phone #: ###-#### Inspection requested via web by Charles Davis GEC is attached to UFER inside. p/s u/g n ok