BLD19-00095
| BLD-Ceiling Grid Inspection | 5/9/2019 | 5/9/2019 | 5/9/2019 3:38:49 PM | P | PASS |
|
|
|
BLD19-01343
| BLD-Framing/Rough-in | 5/8/2019 | 5/9/2019 | 5/9/2019 2:35:26 PM | P | CANC |
|
|
If possible, please call the above number prior to heading to the jobsite. Thank you! Phone #: ###-#### Inspection requested via web by BRS Permitting
|
BLD19-01245
| BLD-Final | 5/8/2019 | 5/9/2019 | 5/9/2019 1:40:02 PM | P | DONE |
|
|
Final Phone #: ###-#### Inspection requested via web by Joshua Adams
|
BLD19-01245
| DOC - Permit Finaled | 5/9/2019 | 5/9/2019 | 5/9/2019 1:39:52 PM | P | PASS |
|
|
All work appeaered to be done in accordance with local codes and ordinances.
|
BLD19-00170
| BLD-Final | 5/8/2019 | 5/9/2019 | 5/9/2019 11:30:41 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher
|
BLD19-00170
| DOC - Permit Finaled | 5/9/2019 | 5/9/2019 | 5/9/2019 11:30:33 AM | P | PASS |
|
|
|
BLD18-01425
| BLD-Ceiling Grid Inspection | 5/8/2019 | 5/9/2019 | 5/9/2019 10:18:28 AM | A | NR |
|
|
James Phone #: ###-####. Area A above grid not ready. Several assemblies not yet completd.
|
BLD19-00318
| BLD-Wall Bracing | 5/8/2019 | 5/9/2019 | 5/9/2019 9:26:51 AM | A | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Inspection was completed yesterday.
|
BLD19-00507
| BLD-Wall cover | 5/8/2019 | 5/9/2019 | 5/9/2019 9:11:21 AM | A | PASS |
|
|
Matt- shear inspection Phone #: ###-####
|
BLD17-04460
| BLD-Framing/Rough-in | 5/6/2019 | 5/9/2019 | 5/9/2019 8:45:29 AM | A | PASS |
|
|
Plans will be at the fireplace. Thanks! Phone #: ###-#### Inspection requested via web by Scott Zierler
|