BLD00-00680
| BLD-Framing/Rough-in | 5/31/2000 | 6/1/2000 | 6/1/2000 12:00:00 AM | A | PART |
|
|
David ###-#### C/N for firewall not framed completele. 6/5/00 10:34:26 AM
|
BLD00-00832
| BLD-Framing/Rough-in | 6/1/2000 | 6/1/2000 | 6/1/2000 12:00:00 AM | A | PASS |
|
|
C/N ok- braces installed @ trusses. Took for Sly.
|
BLD99-03630
| BLD-Framing/Rough-in | 6/1/2000 | 6/1/2000 | 6/1/2000 12:00:00 AM | A | FAIL |
|
|
C/N re: to wall details, 1hr wall framing- recall for conf. asap.
|
BLD00-00439
| BLD-Final | 6/1/2000 | 6/1/2000 | 6/1/2000 12:00:00 AM | A | FAIL |
|
|
Per GS & conf. w/Tony Shiverick. Need complying exits as shown. Add'l guardrail const. req'd. ok to use bldg. if WIP.
|
BLD00-01418
| BLD-Footing | 5/31/2000 | 6/1/2000 | 6/1/2000 12:00:00 AM | P | PART |
|
|
###-#### Add'n- ftg. ok 6/5/00 10:33:01 AM
|
BLD00-01009
| BLD-Framing/Rough-in | 6/1/2000 | 6/1/2000 | 6/1/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/01/2000 at 06:50:49. Contact: ###-####. Ext. walls ok to side 6/5/00 10:32:15 AM
|
MEC00-01825
| Final | 6/1/2000 | 6/1/2000 | 6/1/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Roof unit, not completely weather proofed 6/5/00 10:32:32 AM
|
MEC00-01787
| Pressure Test | 6/1/2000 | 6/1/2000 | 6/1/2000 12:00:00 AM | P | PASS |
|
|
###-#### PT ok 6/5/00 10:33:17 AM
|
BLD00-00846
| BLD-Energy code compliance | 6/1/2000 | 6/1/2000 | 6/1/2000 12:00:00 AM | P | FAIL |
|
|
###-####
|
BLD00-00846
| BLD-Framing/Rough-in | 6/1/2000 | 6/1/2000 | 6/1/2000 12:00:00 AM | P | FAIL |
|
|
c/N not complete 6/5/00 10:32:43 AM
|
BLD00-00535
| BLD-Framing/Rough-in | 6/1/2000 | 6/1/2000 | 6/1/2000 12:00:00 AM | P | PASS |
|
|
duane ###-#### C/N ok 6/5/00 10:32:50 AM
|
BLD99-02745
| BLD-Framing/Rough-in | 6/1/2000 | 6/1/2000 | 6/1/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Recall when arch's detail ready. 6/5/00 10:33:29 AM
|