FIR04-00730
| INSP-Final Inspection | 5/31/2005 | 6/1/2005 | 6/1/2005 3:47:08 PM | | PART |
|
|
Final pending map at panel, signage at door to FACP, signal verification, and removal of temp. covers on detection devices.
|
FIR05-00061
| INSP-Final Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 1:48:26 PM | P | PART |
|
|
Fire alarm passed inspection on the 12th floor only.
|
FIR05-00256
| INSP-Sprinkler Rough-in/Hydro | 6/1/2005 | 6/1/2005 | 6/1/2005 12:58:03 PM | P | PART |
|
|
Fire sprinkler rough in OK for cover.
|
BLD04-02942
| FIRE-Final Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 11:23:25 AM | P | FAIL |
|
|
Door at east exit to corridor must have code approved hardware. All remaining life safety issues are satisfactory.
|
BLD05-00053
| FIRE-Final Inspection | 5/31/2005 | 6/1/2005 | 6/1/2005 10:38:26 AM | A | PASS |
|
|
Fire life safety finaled.
|
FIR05-00236
| INSP-Conference | 5/31/2005 | 6/1/2005 | 6/1/2005 9:36:44 AM | A | DONE |
|
|
Done. Walk through with Phil Doble and Dave Hannah area C. Discussed project phasing and inspection schedule.
|
FIR05-00187
| INSP-Final Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 12:00:00 AM | A | PASS |
|
|
Fire sprinkler finaled.
|
FIR04-00811
| INSP-Final Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 12:00:00 AM | A | PASS |
|
|
Fire sprinkler finaled.
|
FIR05-00146
| INSP-Final Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 12:00:00 AM | P | PASS |
|
|
Fire sprinkler finaled.
|
FIR05-00010
| INSP-Final Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 12:00:00 AM | P | PASS |
|
|
Fire sprinkler finaled for 12th floor only.
|
FIR04-00593
| INSP-Final Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 12:00:00 AM | P | PART |
|
|
Alarms and riser functionality tested. Final pending head wrench, tags, foreward flow test, bell sign, canopies, drain map, and backflow certification.
|
BLD04-02942
| FIRE-Final Inspection | 6/1/2005 | 6/1/2005 | 6/1/2005 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled.
|