Inspections for the day of: Monday, June 1, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-01732 Aging Inspection6/1/20096/1/20096/1/2009 4:06:52 PM DONE
ESC06-01732 DOC - Permit Finaled6/1/20096/1/20096/1/2009 4:06:33 PMPPASS
ESC09-00095 Site Preparation6/1/20096/1/20096/1/2009 3:16:44 PMPPART
Contacted developer to provide a washout pit for the two other projects within developement area. All other areas of compliance have been met per Site developer.
ESC08-00952 Tracking Control6/1/20096/1/20096/1/2009 3:14:35 PMPPART
Re costructed exit per industry standards. Spoke with RP that if they are going to allow the other developers to washout in there washout area that he must provide a pit where signage is of concrete washout.
ESC06-01735 Aging Inspection6/1/20096/1/20096/1/2009 2:35:52 PM DONE
ESC06-01735 DOC - Permit Finaled6/1/20096/1/20096/1/2009 2:34:33 PMPPASS
ESC06-01736 Aging Inspection6/1/20096/1/20096/1/2009 2:27:40 PM DONE
ESC06-01736 DOC - Permit Finaled6/1/20096/1/20096/1/2009 2:27:26 PMPPASS
ESC06-01734 Aging Inspection6/1/20096/1/20096/1/2009 1:48:42 PM DONE
ESC06-01734 DOC - Permit Finaled6/1/20096/1/20096/1/2009 1:48:33 PMPPASS
ESC09-00118 Random Inspection6/1/20096/1/20096/1/2009 11:19:31 AMAPASS
ESC04-01074 DOC - Permit Finaled6/1/20096/1/20096/1/2009 11:14:39 AMPPASS
ESC07-00987 BMP Violation5/28/20096/1/20096/1/2009 11:11:55 AMAPART
Told RP to keep up on trash debris clean up and place signs on washout. Still in order with Ground FX.
ESC09-00211 Site Preparation6/1/20096/1/20096/1/2009 10:01:27 AMAFAIL
Verbal to IRP:
Post ESC sign. Make sure to line the washout pit due to the fact of soil type and ground water table. Will re-inspect on 6/4/09AM.
ESC08-00582 General Inspection6/1/20096/1/20096/1/2009 8:53:00 AM PASS