Inspections for the day of: Tuesday, June 1, 2010.
Number of inspections: 25
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00408 Site Preparation5/25/20105/25/2010   
ESC10-00417 Site Preparation6/1/20106/1/20106/1/2010 5:07:38 PMPPASS
ESC10-00234 Site Final6/1/20106/1/20106/1/2010 5:06:54 PMPPASS
ESC10-00234 DOC - Permit Finaled6/1/20106/1/20106/1/2010 5:06:44 PMPPASS
BLD10-00563 BLD-Final6/1/20106/1/20106/1/2010 5:06:08 PMPPASS
Larry Phone #: ###-####
C/C issued
BLD10-00563 DOC - Permit Finaled6/1/20106/1/20106/1/2010 5:05:49 PMPPASS
BLD10-00564 BLD-Final6/1/20106/1/20106/1/2010 5:05:10 PMPPASS
Larry Phone #: ###-####
C/C issued
BLD10-00564 DOC - Permit Finaled6/1/20106/1/20106/1/2010 5:04:48 PMPPASS
BLD10-00361 BLD-Final6/1/20106/1/20106/1/2010 5:01:39 PMPPASS
Larry Phone #: ###-####
C/C issued
BLD10-00361 DOC - Permit Finaled6/1/20106/1/20106/1/2010 5:01:17 PMPPASS
BLD10-00584 BLD-Final6/1/20106/1/20106/1/2010 4:55:47 PMPPASS
Larry Phone #: ###-####
BLD10-00584 DOC - Permit Finaled6/1/20106/1/20106/1/2010 4:55:33 PMPPASS
BLD10-00785 BLD-Energy code compliance6/1/20106/1/20106/1/2010 4:51:17 PMPPASS
larry Phone #: ###-####
BLD10-00490 BLD-Foundation6/1/20106/1/20106/1/2010 3:27:45 PMPPASS
Wes Phone #: ###-####
BLD10-01014 BLD-Final6/1/20106/1/20106/1/2010 3:26:27 PMPNR
Phone #: ###-####
Contractor to meet with me on site so we can verify insulation installed at top annular space of 4 windows.
BLD10-01189 BLD-Final6/1/20106/1/20106/1/2010 3:21:30 PMPPASS
Completed replacement of 5 windows and 1 patio door. No structural changes were done. The bedroom windows MEET EGRESS. Inspection requested from web by: Pam Page, Office Manager Phone #: ###-####
No one at home.....Appears done and OK.
BLD10-01189 DOC - Permit Finaled6/1/20106/1/20106/1/2010 3:20:35 PMPPASS
BLD09-01683 BLD-Energy code compliance6/1/20106/1/20106/1/2010 3:19:34 PMPPASS
zack Phone #: ###-####
BLD10-01145 BLD-Foundation6/1/20106/1/20106/1/2010 3:17:12 PMPPASS
requests before 2pm//Rob Phone #: ###-####
Mono pour foot and wall OK
ESC10-00233 Site Final6/1/20106/1/20106/1/2010 12:59:16 PMPFAIL
Need to complete landscaping.
ESC10-00244 Site Final6/1/20106/1/20106/1/2010 12:54:51 PMPFAIL
Not complete.......Need 70% landscaping and denuded areas stabilized.
ESC10-00244 Site Preparation6/1/20106/1/20106/1/2010 12:52:24 PMPCANC
ESC10-00146 Site Final6/1/20106/1/20106/1/2010 12:26:19 PMPFAIL
Not Ready......Complete landscaping.
MIS10-00141 BLD-Conference5/28/20106/1/20106/1/2010 11:14:45 AMADONE
Dorothy Pelican (home owner) Called me and said that 2 workers came back 3 days after stop work order issued, and finished roof. I told the homeowner not to pay the contractor until she got the original bid, with the contractors name, address and telephone #. She called me back 4days later and said that the contractor sent the workers back to collect money. She paid them and only got a name and tele #. The contractor is Bryan Denham Constr. Inc. ###-#### Nampa. She did not get the original invoice or bid. I will try to find the Contr. address.........
ESC10-00423 Site Preparation6/1/20106/1/2010