Inspections for the day of: Tuesday, June 1, 2010.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00206 Site Preparation ESC6/1/20106/1/20106/2/2010 1:18:16 PM PART
Message to RP:
Must provide a non storm water washout through the whole duration of the project.
MIS10-00157 ESC-Conference6/1/20106/1/20106/1/2010 4:09:33 PMPFAIL
STOP WORK ORDER ISSUED
Working without a valid ESC perhingmit.
No work shall be done without obtaining a vald ESC permit and also any that Boise City Public Works requires. Will follow up on the project on 6/2/10 AM.
ESC10-00328 Site Preparation5/27/20106/1/20106/1/2010 4:05:02 PMAPASS
ESC09-00208 General Inspection ESC6/1/20106/1/20106/1/2010 3:08:32 PM DONE
ESC09-00208 DOC - Permit Finaled6/1/20106/1/20106/1/2010 3:08:21 PMPPASS
ESC10-00221 DOC - Permit Finaled6/1/20106/1/20106/1/2010 2:46:02 PMPPASS
ESC09-00118 General Inspection ESC6/1/20106/1/20106/1/2010 2:45:43 PM PASS
ESC09-00201 General Inspection ESC6/1/20106/1/20106/1/2010 10:18:44 AM DONE
Work is completed and area stabilized.
ESC09-00201 DOC - Permit Finaled6/1/20106/1/20106/1/2010 10:18:27 AMPPASS
ESC10-00352 Site Preparation5/27/20106/1/20106/1/2010 9:33:41 AMACANC
Work has not begun. Will be starting on 6/7/10. Will inspect on that date.
ESC08-01003 DOC - Permit Finaled6/1/20106/1/20106/1/2010 9:31:53 AMPPASS
ESC09-00029 General Inspection ESC6/1/20106/1/20106/1/2010 9:27:42 AM DONE
Work is completed and area stabilized.
ESC09-00029 DOC - Permit Finaled6/1/20106/1/20106/1/2010 9:26:45 AMPPASS
ESC09-00007 General Inspection ESC6/1/20106/1/20106/1/2010 9:26:16 AM DONE
ESC09-00007 DOC - Permit Finaled6/1/20106/1/20106/1/2010 9:26:08 AMPPASS
ESC10-00366 Random Inspection6/1/20106/1/20106/1/2010 9:23:45 AMAPART
Verbal to RP;
Provide a non storm water washout pit or an sealed external pit. Will re-inspect on 6/4/10am.
ESC10-00366 Random Inspection6/1/20106/1/20106/1/2010 9:23:40 AMAPART
Verbal to RP;
Provide a non storm water washout pit or an sealed external pit. Will re-inspect on 6/4/10am.
ESC10-00282 BMP Violation6/1/20106/1/20106/1/2010 8:27:44 AMPFAIL
Verbal message to RP:
Provide a non storm water washout, and a trash ciontainer for all non wood products. Will re-inspect on 6/3/10am
ESC10-00284 BMP Violation6/1/20106/1/20106/1/2010 8:27:28 AMPFAIL
Verbal message to RP:
Provide a non storm water washout, and a trash ciontainer for all non wood products. Will re-inspect on 6/3/10am
ESC08-01050 General Inspection ESC6/1/20106/1/20106/1/2010 8:19:36 AM DONE
All work is completed and stabilized.
ESC08-01050 DOC - Permit Finaled6/1/20106/1/20106/1/2010 8:19:07 AMPPASS