FIR08-00239
| INSP-Sprinkler Rough-in | 5/31/2011 | 6/1/2011 | 6/2/2011 5:27:32 PM | A | PART |
|
|
Overhead inspection for 2nd floor building #2 units D (east and west), A2, B2, C, C2, and D1 completed. Items noted on plan include seven unprotected concealed spaces at units D, B2 and D1, missing heads per plan at bathrooms units A2 and B2. Also noted pipe size discrepancies between field install and approved plan at A2- need to match plan or provide design info to support changes.
|
FIR08-00239
| INSP-Sprinkler Rough-in | 6/1/2011 | 6/1/2011 | 6/1/2011 4:35:40 PM | P | FAIL |
|
|
Inspection for cover at the 2nd floor building #2 incomplete due to significant field modifications in branch line locations/pipe sizes which differ from the approved design.
|
BLD10-02916
| FIRE-Conference | 6/1/2011 | 6/1/2011 | 6/1/2011 4:29:18 PM | P | DONE |
|
|
Jay Phone #: ###-#### On site conference with general contractor regarding fire protection and ventilation at the medical gas room. Also discussed related fire code review note comments.
|
FIR11-00203
| INSP-Sprinkler Rough-in | 6/1/2011 | 6/1/2011 | 6/1/2011 4:24:42 PM | P | PART |
|
|
Okay to cover fire sprinkler work above the grid ceilings.
|
BLD11-01160
| FIRE-Conference | 6/1/2011 | 6/1/2011 | 6/1/2011 4:23:00 PM | A | DONE |
|
|
Site inspection to determine temporary occupancy of three spaces prior to issuance of permit.
|
BLD11-01062
| FIRE-Final Inspection | 6/1/2011 | 6/1/2011 | 6/1/2011 2:00:51 PM | P | PASS |
|
|
Locking hardware at the west tenant door to the restroom access hall removed. Fire life safety finaled.
|