Inspections for the day of: Wednesday, June 1, 2011.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00898 General Inspection6/1/20116/1/20116/1/2011 2:53:16 PM CANC
Moved to a confrence on 6/3/2011am
ESC11-00220 BMP Violation6/1/20116/1/20116/1/2011 2:41:18 PMPFAIL
Verbal to RP:
Clean up all hard surfaes within the subdivision of all sediment and debris. Also maintain all sotrm drain inlets on both sides of Bard Ave. Will follow up tomorrow.
ESC11-00258 BMP Violation6/1/20116/1/20116/1/2011 2:40:45 PMPFAIL
Verbal to RP:
Clean up all hard surfaes within the subdivision of all sediment and debris. Also maintain all sotrm drain inlets on both sides of Bard Ave. Will follow up tomorrow.
ESC11-00187 General Inspection6/1/20116/1/20116/1/2011 2:37:26 PMAFAIL
Verbal to RP:
Clean up all hard surfaes within the subdivision of all sediment and debris.
ESC11-00207 BMP Violation6/1/20116/1/20116/1/2011 2:36:41 PMPFAIL
Verbal to RP:
Clean up all hard surfaes within the subdivision of all sediment and debris. Also maintain all sotrm drain inlets on both sides of Bard Ave. Will follow up tomorrow.
ESC10-00640 Aging Inspection6/1/20116/1/20116/1/2011 2:30:49 PM DONE
Permit Finaled.
ESC10-00640 DOC - Permit Finaled6/1/20116/1/20116/1/2011 2:30:31 PMPPASS
ESC10-00910 General Inspection6/1/20116/1/20116/1/2011 2:03:56 PM DONE
Permit finaled.
ESC10-00910 DOC - Permit Finaled6/1/20116/1/20116/1/2011 2:03:25 PMPPASS
ESC11-00031 Random Inspection6/1/20116/1/20116/1/2011 1:36:22 PMAPASS
ESC11-00029 General Inspection6/1/20116/1/20116/1/2011 1:36:11 PMAPASS
ESC11-00309 General Inspection6/1/20116/1/20116/1/2011 1:16:49 PM PASS
ESC10-00890 General Inspection6/1/20116/1/20116/1/2011 1:05:54 PM DONE
Permit finaled.
ESC10-00890 DOC - Permit Finaled6/1/20116/1/20116/1/2011 1:04:54 PMPPASS
ESC09-00352 General Inspection6/1/20116/1/20116/1/2011 11:46:55 AMAFAIL
Verbal to GC, Wetlands Group and Parks Dept.;
The section of the project on the west side of Park Center Bridge (5 acres) has been inactive of more than 4 days. Must stabilize with an approved temporary or a perminately method of stabilization.
Also keep monitoring the Wallings corridor and Boise River level. Make sure that perventive measures are ready to install prior to the Wallsing Corridor discharging into the Boise River to capture sediment if water is turbid at the time of discharge.
ESC11-00176 General Inspection6/1/20116/1/20116/1/2011 11:40:51 AM PASS
ESC11-00223 General Inspection6/1/20116/1/20116/1/2011 10:38:27 AM PASS
ESC10-00531 BMP Violation6/1/20116/1/20116/1/2011 10:26:25 AMPFAIL
Correction Notice:
(Verbal to RP. Written left on site).
Clean up all sediment and debris off of all hard surfaces.
Maintain all storm drain inlet protection in all paved areas of the project.

Failure to comply within the given time frame, will result in a stop work order. Will re-inspect on 6/2/2011 PM.
ESC09-00012 Aging Inspection1/4/20116/1/20115/27/2011 8:36:05 AMACANC
Permit has expired.