BLD15-01177
| BLD-Other | 6/1/2015 | 6/1/2015 | 6/9/2015 8:12:05 AM | P | CANC |
|
|
Colar // Scott Phone #: ###-####
|
BLD15-01477
| BLD-Footing | 5/29/2015 | 6/1/2015 | 6/1/2015 5:31:54 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD15-01076
| BLD-Footing | 5/29/2015 | 6/1/2015 | 6/1/2015 5:31:17 PM | P | PASS |
|
|
John Phone #: ###-####
|
BLD14-03259
| BLD-Other | 5/30/2015 | 6/1/2015 | 6/1/2015 2:09:12 PM | A | PASS |
|
|
Phase 1 final walk through. please call me to meet on site. thank you Brandon Phone #: ###-#### Inspection requested via web by Brandon Juarez Troy signed off phase 1 phase 1 OK to occupy as shown on plans.
|
BLD15-00703
| BLD-Footing | 6/1/2015 | 6/1/2015 | 6/1/2015 2:06:30 PM | P | PASS |
|
|
Manual Phone #: ###-####
|
BLD15-00704
| BLD-Foundation | 6/1/2015 | 6/1/2015 | 6/1/2015 2:06:10 PM | P | PASS |
|
|
Manual Phone #: ###-####
|
BLD15-00706
| BLD-Foundation | 6/1/2015 | 6/1/2015 | 6/1/2015 2:05:51 PM | P | PASS |
|
|
Manual Phone #: ###-####
|
BLD15-01411
| BLD-Final | 5/29/2015 | 6/1/2015 | 6/1/2015 1:58:47 PM | P | PASS |
|
|
Call half hour before // Lety Phone #: ###-#### OK for Perm Occ.
|
GCB15-00012
| GCB-Framing | 5/29/2015 | 6/1/2015 | 6/1/2015 12:11:00 PM | A | PASS |
|
|
Travis ###-#### Plans do not have all pages stamped PDS. Called G C (Keegan) .....These are the plans that Boise sent to them. Allowed Contr. to Rock all areas .....after Electr R/I approval ......Except areas that require insulation. Contr. to call for Energy Code insp. when ready.
|
GCB14-00099
| GCB-Courtesy | 5/29/2015 | 6/1/2015 | 6/1/2015 11:13:00 AM | A | DONE |
|
|
Gary ###-#### - energy conference ........
|
BLD14-02796
| BLD-Final | 6/1/2015 | 6/1/2015 | 6/1/2015 12:00:00 AM | P | CANC |
|
|
Conference - Zach Phone #: ###-####
|