Inspections for the day of: Wednesday, June 1, 2016.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00909 INSP-Final Inspection5/31/20166/1/20166/1/2016 2:37:36 PMAPASS
Underground hydro test passed
BLD16-00921 FIRE-Final Inspection6/1/20166/1/20166/1/2016 1:58:48 PMPPASS
life safety passed
FIR16-00282 INSP-Sprinkler Rough-in6/1/20166/1/20166/1/2016 1:01:52 PMPPART
1st floor north half piping is ok to cover. Tenting inspection failed. North half of the second floor can not be covered until the additional 90s and relocated heads in the remote area have been addressed with plan review. None of the third floor can be covered until the tenting inspection has passed. The insulation used for the tenting needs to be a minimum 38R.
BLD16-00591 FIRE-Final Inspection6/1/20166/1/20166/1/2016 12:57:30 PMPFAIL
Still need the exterior hardware changed to single action. All of the other items have been corrected.
BLD16-01749 FIRE-Final Inspection5/27/20166/1/20166/1/2016 10:02:56 AMAPASS
life safety passed
BLD16-01292 FIRE-Final Inspection5/31/20166/1/20166/1/2016 10:02:33 AMAPASS
life safety passed
BLD15-04261 FIRE-Final Inspection5/31/20166/1/20166/1/2016 8:02:46 AMAPASS
Life safety passed