FIR15-00909
| INSP-Final Inspection | 5/31/2016 | 6/1/2016 | 6/1/2016 2:37:36 PM | A | PASS |
|
|
Underground hydro test passed
|
BLD16-00921
| FIRE-Final Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 1:58:48 PM | P | PASS |
|
|
life safety passed
|
FIR16-00282
| INSP-Sprinkler Rough-in | 6/1/2016 | 6/1/2016 | 6/1/2016 1:01:52 PM | P | PART |
|
|
1st floor north half piping is ok to cover. Tenting inspection failed. North half of the second floor can not be covered until the additional 90s and relocated heads in the remote area have been addressed with plan review. None of the third floor can be covered until the tenting inspection has passed. The insulation used for the tenting needs to be a minimum 38R.
|
BLD16-00591
| FIRE-Final Inspection | 6/1/2016 | 6/1/2016 | 6/1/2016 12:57:30 PM | P | FAIL |
|
|
Still need the exterior hardware changed to single action. All of the other items have been corrected.
|
BLD16-01749
| FIRE-Final Inspection | 5/27/2016 | 6/1/2016 | 6/1/2016 10:02:56 AM | A | PASS |
|
|
life safety passed
|
BLD16-01292
| FIRE-Final Inspection | 5/31/2016 | 6/1/2016 | 6/1/2016 10:02:33 AM | A | PASS |
|
|
life safety passed
|
BLD15-04261
| FIRE-Final Inspection | 5/31/2016 | 6/1/2016 | 6/1/2016 8:02:46 AM | A | PASS |
|
|
Life safety passed
|