MEC16-02299
| Pressure Test | 5/31/2016 | 6/1/2016 | 6/1/2016 3:37:01 PM | A | PASS |
|
|
Ryan Phone #: ###-#### gas test from vapor to building and inside building to boiler and regulator to heater at office
|
MEC16-02299
| Final | 6/1/2016 | 6/1/2016 | 6/1/2016 3:35:11 PM | P | PASS |
|
|
Ryan Phone #: ###-####
|
MEC16-02287
| Pressure Test | 5/31/2016 | 6/1/2016 | 6/1/2016 11:39:00 AM | A | PASS |
|
|
Jim Phone #: ###-#### 20# test gas to future furnace
|
MEC16-02287
| Final | 6/1/2016 | 6/1/2016 | 6/1/2016 11:38:23 AM | P | PASS |
|
|
Jim Phone #: ###-####
|
MEC16-02306
| Final | 5/30/2016 | 6/1/2016 | 6/1/2016 11:05:44 AM | A | PASS |
|
|
Please inspect after 10 AM if possible. Phone #: ###-#### Inspection requested via web by Mary LaFayette
|