PLM20-01563
| Groundwork | 6/1/2020 | 6/1/2020 | 6/1/2020 3:55:49 PM | P | PART |
|
|
if questions call Steve @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann SOI trunk line partial.........ds
|
PLM20-02225
| Plumbing Rough-in | 6/1/2020 | 6/1/2020 | 6/1/2020 3:14:28 PM | P | PASS |
|
|
Please call Tim with any questions. Thank you Phone #: ###-#### Inspection requested via web by Kelly King
|
PLM20-01838
| Final | 6/1/2020 | 6/1/2020 | 6/1/2020 2:15:42 PM | P | FAIL |
|
|
Work is part of the 2019 Streetscape Project. Backflow is located directly across the street from the Basque Center in the Blvd Strip to the East. Phone #: ###-#### Inspection requested via web by Travis Gingerich RP needs to be tested..........ds
|
PLM20-02231
| Final | 6/1/2020 | 6/1/2020 | 6/1/2020 2:02:13 PM | P | PART |
|
|
Backflow and Main valve were broken during excavation. Re-connected both to existing water line. Phone #: ###-#### Inspection requested via web by Travis Gingerich pvb not tested
|
PLM20-02178
| Plumbing Rough-in | 6/1/2020 | 6/1/2020 | 6/1/2020 1:34:08 PM | P | PASS |
|
|
Mait Phone #: ###-#### Inspection requested via web by Jerry Downer
|
PLM20-01328
| Final | 5/29/2020 | 6/1/2020 | 6/1/2020 10:22:35 AM | A | PASS |
|
|
Garage code is 1957. Phone #: ###-#### Inspection requested via web by David Stephenson
|
PLM20-00294
| Final | 6/1/2020 | 6/1/2020 | 6/1/2020 9:26:22 AM | A | NR |
|
|
Ready for final, trim is done except the main bath tub reset, delayed due to other trade problems. Request final. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|