Inspections for the day of: Monday, June 1, 2020.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR20-00313 INSP-Sprinkler Rough-in6/1/20206/1/20206/1/2020 3:22:03 PMPCANC
Gabe Garduno is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
FIR20-00313 INSP-Sprinkler Rough-in5/29/20206/1/20206/1/2020 1:50:24 PMAPART
Todays inspection was for the three groups of six apartments starting from the east end. Rough-in passed but four pendant needs to be relocated as discussed. Two sidewall heads need to be installed, per plan, under the intermediate laddings as discussed. Piping at the fur down in these three groups of six can be covered. No piping on the third floor can be covered until a tenting inspection has been passed. Cam is going to provide as-builts with the additional 90's included in calcs as discussed and the possible deletion of heads at the landings.

Cam Hess is the contact (: Phone #: ###-#### Inspection requested via web by Stan Beus
FIR19-00790 INSP-Sprinkler Rough-in5/29/20206/1/20206/1/2020 12:00:00 AMACANC
screened // Tanner Phone #: ###-####