PLM96-01547
| INSP - Plumbing Rough-in | 6/10/1996 | 6/10/1996 | 2/24/1999 12:00:00 AM | P | PASS |
|
|
AFTER 3PM PLEASE.
|
PLM96-01595
| INSP - Plumbing Rough-in | 6/10/1996 | 6/10/1996 | 6/10/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 3 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1 R/I O/K 6/10/6 347
|
PLM96-01442
| INSP - Plumbing Rough-in | 6/10/1996 | 6/10/1996 | 6/10/1996 12:00:00 AM | | FAIL |
|
|
/ / 347 - W/C 3 BASIN 4 TUB 3 SINK 1 W/B 1 W/H 1 R/I FAILED UPC 316 (b) 7 STRAP DWV @ 4' UPC INSTALL 22.I 1008.6 HEATED JOINTS
|
PLM96-01547
| INSP - Final | 6/10/1996 | 6/10/1996 | 6/10/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - final o/k 6/10/6 347
|
PLM96-01547
| INSP - Plumbing Rough-in | 6/10/1996 | 6/10/1996 | 6/10/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - l/t 1 w/h 1 w/b 1 r/i o/k 6/10/6 347
|
PLM96-00733
| INSP - Final | 6/7/1996 | 6/10/1996 | 6/10/1996 12:00:00 AM | A | PASS |
|
|
06/07/96 347 - AFTER 9:00 A.M. PLEASE. w/c 2 basin 2 tub 2 sink 1 w/b 1 w/h 1 final o/k 6/10/6 347
|