PLM01-02684
| Final | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 6/10/2002 10:18:57 AM set all fixtures, mop sink not to be used as a shower, temp occ ok
|
PLM02-01683
| Sprinkler (Final) | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PASS |
|
|
JACK ###-####
|
PLM02-01684
| Plumbing Rough-in | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PASS |
|
|
CRIG ###-####
|
PLM02-01685
| Plumbing Rough-in | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 330 On 6/10/2002 2:53:46 PM plumber called , had to have the inspection this pm but he couldnt get the thing to hold water.
|
PLM02-00906
| Roof Drains | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PART |
|
|
###-#### donny grid e 1-4 3rd floor s.e. corner 6/10/2002 1:38:42 PM
|
PLM02-01680
| Sprinkler (Final) | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-01679
| Sprinkler (Final) | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PASS |
|
|
|
PLM02-01682
| Sprinkler (Final) | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | CANC |
|
|
for spr tie-in- eddie ###-####
|
PLM01-02062
| Plumbing Rough-in | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PASS |
|
|
expiration / ###-#### Husband had surgery will finish when recovered extended till whenever, bill 6/10/2002 2:05:58 PM
|