Inspections for the day of: Monday, June 10, 2002.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00437 BLD-Framing/Rough-in6/10/20026/10/20026/10/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 06/10/2002 at 07:13:28. Contact: ###-####. RESTROOMS, HALL CLOSETS OK PENDING TRADES INSP...WALLS ONLY. 6/10/2002 11:46:41 AM
BLD01-01796 BLD-Conference6/10/20026/10/20026/10/2002 12:00:00 AMAPASS
w/ 408 & contractor...shell resubmittal ok'd ( minor change) 6/10/2002 9:37:13 AM
BLD02-00710 BLD-Foundation6/7/20026/10/20026/10/2002 12:00:00 AMAPART
###-####; N-W INT. FDN. WALL ONLY, BAR OK... RECALL FOR EXT WALL PORTIONS WHEN READY 6/10/2002 11:24:34 AM
BLD00-01756 BLD-Conference6/7/20026/10/20026/10/2002 12:00:00 AMPPASS
renewal- joe- ###-####
MEC01-02333 Conference6/7/20026/10/20026/10/2002 12:00:00 AMPPASS
joe ###-####--renewal wip...ok to extend permit...final w/ struct. 6/10/2002 6:03:13 PM
BLD02-00698 BLD-Framing/Rough-in6/6/20026/10/20026/10/2002 12:00:00 AMPPART
(-###-####) walls ok...hvac pending. 6/10/2002 3:01:42 PM
BLD01-01796 BLD-Final6/10/20026/10/20026/10/2002 12:00:00 AMPFAIL
shell for t/i at Fidelity Bldg...nr, need elec permit finalled, informed gen. contractor (Terry Leighton) for t/i Bld02--00698. 6/10/2002 2:59:45 PM
BLD02-00902 BLD-Final6/10/20026/10/20026/10/2002 12:00:00 AMPNR
robert- ###-#### fn need truss calcs for struct final. 6/10/2002 3:17:13 PM
BLD00-03686 BLD-Conference6/10/20026/10/20026/10/2002 12:00:00 AMPPASS
expiration needs to be doc finaled ###-#### ...ok 6/10/2002 4:01:33 PM
BLD01-02750 BLD-Conference6/10/20026/10/20026/10/2002 12:00:00 AMPPASS
w/ Titan re Canopys...also met w/ Mike Phillips resubmit to Plan check for changes. 6/10/2002 3:15:44 PM
BLD02-00902 BLD-Framing/Rough-in6/10/20026/10/20026/10/2002 12:00:00 AMPPART
cut attic access....show beams per plans at car port; reinspect hdr at "shed"....header ok, need truss calcs , ok to continue. 6/10/2002 3:16:49 PM
BLD02-00505 BLD-Conference6/10/20026/10/20026/10/2002 12:00:00 AMPPASS
w/ arch & cont at site re 1hr elev...looked at floor joisting...may need addl nails for diaphragm straps.
BLD00-03686 BLD-Final6/10/20026/10/20026/10/2002 12:00:00 AMPPASS
MEC01-02333 Conference6/10/20026/10/20026/10/2002 12:00:00 AMPCANC
BLD00-01756 BLD-Conference6/10/20026/10/20026/10/2002 12:00:00 AMPCANC
###-####