BLD02-00437
| BLD-Framing/Rough-in | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/10/2002 at 07:13:28. Contact: ###-####. RESTROOMS, HALL CLOSETS OK PENDING TRADES INSP...WALLS ONLY. 6/10/2002 11:46:41 AM
|
BLD01-01796
| BLD-Conference | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | A | PASS |
|
|
w/ 408 & contractor...shell resubmittal ok'd ( minor change) 6/10/2002 9:37:13 AM
|
BLD02-00710
| BLD-Foundation | 6/7/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | A | PART |
|
|
###-####; N-W INT. FDN. WALL ONLY, BAR OK... RECALL FOR EXT WALL PORTIONS WHEN READY 6/10/2002 11:24:34 AM
|
BLD00-01756
| BLD-Conference | 6/7/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PASS |
|
|
renewal- joe- ###-####
|
MEC01-02333
| Conference | 6/7/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PASS |
|
|
joe ###-####--renewal wip...ok to extend permit...final w/ struct. 6/10/2002 6:03:13 PM
|
BLD02-00698
| BLD-Framing/Rough-in | 6/6/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PART |
|
|
(-###-####) walls ok...hvac pending. 6/10/2002 3:01:42 PM
|
BLD01-01796
| BLD-Final | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | FAIL |
|
|
shell for t/i at Fidelity Bldg...nr, need elec permit finalled, informed gen. contractor (Terry Leighton) for t/i Bld02--00698. 6/10/2002 2:59:45 PM
|
BLD02-00902
| BLD-Final | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | NR |
|
|
robert- ###-#### fn need truss calcs for struct final. 6/10/2002 3:17:13 PM
|
BLD00-03686
| BLD-Conference | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PASS |
|
|
expiration needs to be doc finaled ###-#### ...ok 6/10/2002 4:01:33 PM
|
BLD01-02750
| BLD-Conference | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PASS |
|
|
w/ Titan re Canopys...also met w/ Mike Phillips resubmit to Plan check for changes. 6/10/2002 3:15:44 PM
|
BLD02-00902
| BLD-Framing/Rough-in | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PART |
|
|
cut attic access....show beams per plans at car port; reinspect hdr at "shed"....header ok, need truss calcs , ok to continue. 6/10/2002 3:16:49 PM
|
BLD02-00505
| BLD-Conference | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PASS |
|
|
w/ arch & cont at site re 1hr elev...looked at floor joisting...may need addl nails for diaphragm straps.
|
BLD00-03686
| BLD-Final | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | PASS |
|
|
|
MEC01-02333
| Conference | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | CANC |
|
|
|
BLD00-01756
| BLD-Conference | 6/10/2002 | 6/10/2002 | 6/10/2002 12:00:00 AM | P | CANC |
|
|
###-####
|