Inspections for the day of: Tuesday, June 10, 2003.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00920 BLD-Framing/Rough-in6/9/20036/10/20036/10/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 6/9/2003 at 12:32:37 PM. Contact: ###-####. 1hr control room. 6/10/2003 12:06:17 PM 6/10/2003 12:06:33 PM
MEC03-01479 Pressure Test6/9/20036/10/20036/10/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 6/9/2003 at 1:43:13 PM.
MEC03-01479 Final6/9/20036/10/20036/10/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 6/9/2003 at 1:43:36 PM.
BLD03-00650 BLD-Framing/Rough-in6/9/20036/10/20036/10/2003 12:00:00 AMAPASS
lloyd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore, Ok talked with George will allow 3/8 variation to the minimum on tread. 6/10/2003 11:22:15 AM
BLD03-00650 BLD-Energy code compliance6/9/20036/10/20036/10/2003 12:00:00 AMAPASS
lloyd; Phone #: ###-#### Internet Inspection Request from: Barbara Moore, ran new report with multiple window values still 4% above. 6/10/2003 11:21:25 AM
BLD03-00924 BLD-Final6/9/20036/10/20036/10/2003 12:00:00 AMANH
###-####
BLD00-03014 BLD-Foundation6/9/20036/10/20036/10/2003 12:00:00 AMAPASS
lazaro wall; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. All foorting and walls have been changed to #4 bar instead of #5 wil new detail from architect. 6/10/2003 11:23:43 AM
MIS03-00115 BLD-Final6/9/20036/10/20036/10/2003 12:00:00 AMAPASS
ok completed 3 items. 6/10/2003 9:58:45 AM
BLD03-00617 BLD-Final6/10/20036/10/20036/10/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 6/10/2003 at 7:45:02 AM. Contact: ###-####.
BLD03-01064 BLD-Framing/Rough-in6/10/20036/10/20036/10/2003 12:00:00 AMPFAIL
richard; Phone #: ###-#### Internet Inspection Request from: Barbara Mooreposted ac/n to brace top of wall. 6/10/2003 3:44:22 PM
BLD02-02743 BLD-Footing6/10/20036/10/20036/10/2003 12:00:00 AMPPART
don; Phone #: ###-#### Internet Inspection Request from: Barbara MooreThis dumpster changed from a mono pour to a footing with stem wall,left c/n with contractor to provide new detail from architect.6/10/2003 2:57:40 PM 6/10/2003 3:01:12 PM
BLD03-00250 BLD-Footing6/10/20036/10/20036/10/2003 12:00:00 AMPPART
###-#### tony. Teragon on site to perform special inspection. 6/10/2003 2:32:13 PM
BLD02-02003 BLD-Final6/9/20036/10/20036/10/2003 12:00:00 AMPPASS
ZOE; Phone #: ###-#### Internet Inspection Request from: Darla Downs