Inspections for the day of: Tuesday, June 10, 2003.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC03-00450 Final6/9/20036/10/20036/10/2003 12:00:00 AMAPASS
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
MEC02-03522 Final6/9/20036/10/20036/10/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 6/9/2003 at 1:04:37 PM. Contact: ###-####.
MEC03-01434 Pressure Test6/9/20036/10/20036/10/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 6/9/2003 at 2:16:08 PM. Contact: ###-####.
MEC03-01434 Rough-in6/9/20036/10/20036/10/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 6/9/2003 at 2:16:23 PM. Contact: ###-####.
MEC03-01184 Rough-in6/9/20036/10/20036/10/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 6/9/2003 at 2:43:06 PM. Contact: ###-####. Prior correction notice items completed. 6/10/2003 9:05:33 AM
BLD03-01128 BLD-Framing/Rough-in6/10/20036/10/20036/10/2003 12:00:00 AMPPART
james; Phone #: ###-#### Internet Inspection Request from: Annette Moore FOUNDATION NOT FRAMING. Wip--95% ready at time of inspection. 6/10/2003 3:28:51 PM
BLD03-00519 BLD-Energy code compliance6/10/20036/10/20036/10/2003 12:00:00 AMPPASS
prestige homes; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD03-00991 BLD-Wall cover6/10/20036/10/20036/10/2003 12:00:00 AMPPART
james; Phone #: ###-#### Internet Inspection Request from: Barbara Moore FOUNDATION NOT WALL COVER--wip--25% ready at time fo inspection. 6/10/2003 1:50:54 PM
BLD03-00521 BLD-Framing/Rough-in6/10/20036/10/20036/10/2003 12:00:00 AMPFAIL
TERRY; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/N posted--Need air seal, fireplace inspection. Do not insulate. 6/10/2003 3:19:33 PM