FIR03-00510
| INSP-Final Inspection | 6/8/2004 | 6/10/2004 | 6/10/2004 12:00:00 AM | A | CANC |
|
|
Billy; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
FIR04-00232
| INSP-Final Inspection | 6/9/2004 | 6/10/2004 | 6/10/2004 12:00:00 AM | A | PASS |
|
|
darren; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Add one hour inspection time for this permit 6-7 am; final okay 6/10/2004 7:15:50 AM
|
FIR04-00325
| INSP-Final Inspection | 6/9/2004 | 6/10/2004 | 6/10/2004 12:00:00 AM | A | PASS |
|
|
darren; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Add one hour inspection time from 7-8 am; final okay 6/10/2004 7:16:13 AM
|
FIR03-00814
| INSP-Sprinkler Rough-in | 6/9/2004 | 6/10/2004 | 6/10/2004 12:00:00 AM | A | PART |
|
|
###-#### trent Plan modifications made that will require resubmittals - increased to 8 inch and added two 90's; okay to cover 6/10/2004 8:04:19 AM
|
FIR04-00249
| INSP-Final Inspection | 6/9/2004 | 6/10/2004 | 6/10/2004 12:00:00 AM | A | PASS |
|
|
|
BLD04-00593
| FIRE-Final Inspection | 6/10/2004 | 6/10/2004 | 6/10/2004 12:00:00 AM | A | PASS |
|
|
Final okay 6/10/2004 7:17:15 AM
|
BLD04-00497
| FIRE-Final Inspection | 6/10/2004 | 6/10/2004 | 6/10/2004 12:00:00 AM | A | PASS |
|
|
Final okay 6/10/2004 7:17:23 AM
|
FIR04-00142
| INSP-Conference | 6/10/2004 | 6/10/2004 | 6/10/2004 12:00:00 AM | P | PART |
|
|
Talked to Jeff of TVFP about the EQ on the new main added and the 2nd floor mechanical room - no ceiling and uprights may be overspaced from east wall above duct work 6/10/2004 2:31:56 PM
|
BLD02-02842
| FIRE-Final Inspection | 6/10/2004 | 6/10/2004 | 6/10/2004 12:00:00 AM | P | PASS |
|
|
|
FIR04-00152
| INSP-Final Inspection | 6/9/2004 | 6/10/2004 | 6/10/2004 12:00:00 AM | P | FAIL |
|
|
Rick, Per our conversation on 06/09/04, We are scheduling a final test for the Idaho Food Bank. Hopefully this works. The NFPA 70 should have been faxed in on 06/07/04. Any questions give me a call. Thanks Mike; Phone #: ###-#### Internet Inspection Request from: Jason Minnick Need map at RA 6/10/2004 2:32:50 PM
|
FIR03-00343
| INSP-Sprinkler Rough-in/Hydro | 6/8/2004 | 6/10/2004 | 6/10/2004 12:00:00 AM | P | FAIL |
|
|
Contact: Terry; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley All items have been corrected from previous inspection except onehead obstrcuted in parking outside the elevator lobby; need spare heads and test all sprinkler flows, tampers and trip test the dry system and witness pump test 6/10/2004 3:35:03 PM
|