FIR05-00315
| INSP-Sprinkler Rough-in | 6/10/2005 | 6/10/2005 | 6/10/2005 4:17:29 PM | P | PART |
|
|
Fire supply UG stub out and riser piece OK to cover. Verify seismic clearance and that no C900 is exposed above floor slab at a later date.
|
BLD04-02970
| FIRE-Final Inspection | 6/9/2005 | 6/10/2005 | 6/10/2005 12:36:12 PM | A | FAIL |
|
|
Provide building address numbers of approved size, provide documentation of current annual inspection on existing fire sprinkler systems in the attatched building, provide fire ext. at bay door as shown on plans.
|
FIR05-00334
| INSP-Final Inspection | 6/10/2005 | 6/10/2005 | 6/10/2005 12:30:41 PM | P | PASS |
|
|
Fire alarm finaled.
|
FIR05-00258
| INSP-Final Inspection | 6/10/2005 | 6/10/2005 | 6/10/2005 12:27:36 PM | P | PASS |
|
|
Fire sprinkler finaled.
|
BLD04-02505
| FIRE-Conference | 6/9/2005 | 6/10/2005 | 6/10/2005 9:40:11 AM | A | DONE |
|
|
Discussed location of FACP and clearance requirements.
|