Inspections for the day of: Friday, June 10, 2005.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00623 INSP-Final Inspection6/10/20056/10/20056/10/2005 3:59:50 PMPPASS
Fire sprinkler finaled
BLD05-00600 FIRE-Final Inspection6/10/20056/10/20056/10/2005 2:57:11 PMPPART
Temporary occupancy was given with sam rogers permission until the correct annunciator have been installed for the duct smoke detectors and tested.
BLD04-00590 FIRE-Final Inspection6/10/20056/10/20056/10/2005 2:53:50 PMPFAIL
Contractor needs to verify all comments addressed on drawings and in review notes.
BLD04-01519 FIRE-Final Inspection6/10/20056/10/20056/10/2005 2:50:15 PMPFAIL
Provide approved hardware on the office, conference and auditors rooms. Lever type is ok. See review commens. Repair existing exit signs.
BLD04-01518 FIRE-Final Inspection6/10/20056/10/20056/10/2005 2:49:48 PMPFAIL
Provide approved hardware on the office, conference and auditors rooms. Lever type is ok. See review commens. Repair existing exit signs.
FIR05-00249 INSP-Final Inspection6/9/20056/10/20056/10/2005 11:32:41 AMAPASS
Fire alarm finaled
FIR04-00776 INSP-Final Inspection6/9/20056/10/20056/10/2005 9:35:19 AMAPASS
fire alarm finaled
FIR04-00775 INSP-Final Inspection6/9/20056/10/20056/10/2005 9:34:02 AMAPASS
fire alarm finaled
FIR05-00259 INSP-Sprinkler Rough-in/Hydro6/9/20056/10/20056/10/2005 8:39:25 AMAPASS
Sprinkler piping in new addition is ok to cover.
BLD00-03010 FIRE-Final Inspection6/10/20056/10/20056/10/2005 12:00:00 AMPPASS
Fire life safety finaled