Inspections for the day of: Tuesday, June 10, 2008.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00303 General Inspection6/10/20086/10/20086/10/2008 4:15:47 PMPPART
looked ok
ESC08-00322 General Inspection6/10/20086/10/20086/10/2008 4:14:33 PMPPART
looked ok
ESC08-00092 General Inspection6/10/20086/10/20086/10/2008 4:08:03 PMPPASS
looked ok
ELE08-01170 Electrical Rough-In6/10/20086/10/20086/10/2008 4:06:20 PMPPASS
reinspection Phone #: ###-#### Internet Inspection Request from: Jari Rivers correction made, potting compound ok
ELE08-00900 Electrical Rough-In6/10/20086/10/20086/10/2008 3:09:33 PMPPASS
Scheduled by a contractor via Hello! on 6/10/2008 at 9:25:17 AM. Contact: ###-####. walls ok to cover anop
ESC08-00303 General Inspection6/10/20086/10/20086/10/2008 2:20:03 PMAPART
looked ok
ESC06-01396 General Inspection6/10/20086/10/20086/10/2008 2:19:01 PMAPASS
looked ok, building done, ti for elec permit only
ELE08-01063 Final6/10/20086/10/20086/10/2008 2:00:44 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Jari Rivers ok to final
ELE08-01331 Final6/10/20086/10/20086/10/2008 12:56:07 PMPPASS
corrections made, ok to final, signed card
ELE08-00900 Permanent Service6/10/20086/10/20086/10/2008 12:49:21 PMPPASS
Scheduled by a contractor via Hello! on 6/10/2008 at 9:26:16 AM. Contact: ###-####. p/s o/h rec ok, corrections made
ELE08-01309 Final6/10/20086/10/20086/10/2008 12:13:05 PMPPASS
Jesse Phone #: ###-#### ok to final
ELE08-01170 Electrical Rough-In6/9/20086/10/20086/10/2008 10:14:49 AMAFAIL
potting inspection Phone #: ###-#### Internet Inspection Request from: Jari Rivers no access due to plastering in progress, called contractor, told to call when can enter pool, also said that from a distance there appears to not be enough potting compound
ELE08-01552 Final6/9/20086/10/20086/10/2008 9:54:48 AMACANC
Cover inspection for the stair well on the north west side of the TI Phone #: ###-#### Internet Inspection Request from: Spencer Mclean wrong type request, see ri, called contractor about bld for ti space
ELE08-01552 Electrical Rough-In6/10/20086/10/20086/10/2008 9:45:48 AMAPART
Cover inspection for the stair well on the north west side of the TI Phone #: ###-#### Internet Inspection Request from: Spencer Mclean north west stairwell only ok to cover
ELE08-01103 Electrical Rough-In6/9/20086/10/20086/10/2008 9:43:31 AMAPART
Forrest Phone #: ###-#### ok to cover baths 2nd floor, reviewed lighting progress and perimeter lites ok, no esc
ELE07-03975 Final6/9/20086/10/20086/10/2008 8:45:50 AMAFAIL
joe - ###-#### - on the 2 new additions not being modified met electrician, left correction notice, NEC 250.122 equipment grounds shall be per table, 408.4 citcuit directory shall be clear, concise, and explanatory for each circuit, 422.31(B) shall provide disconnect for water heaters, 250.104(A)(1) shall bond hot and cold water piping per table 250.122, BCC shall install all switch plates and fixtures
ELE08-01083 Electrical Rough-In6/9/20086/10/20086/10/2008 12:00:00 AMPCANC
Morgan Phone #: ###-####