BLD07-00855
| FIRE-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 6:12:10 PM | P | NR |
|
|
Discussed shell building requirements regarding fire life safety issues.
|
FIR08-00361
| INSP-Sprinkler Rough-in/Hydro | 6/9/2008 | 6/10/2008 | 6/10/2008 4:04:49 PM | A | FAIL |
|
|
Sprinkler heads at each first floor unit under the stairways are overspaced, 2nd floor mid unit hallway head needs relocated due to overspacing, remainder of flow testing passed, tenting at the attic spaces is satisfactory.
|
BLD08-00956
| FIRE-Conference | 6/9/2008 | 6/10/2008 | 6/10/2008 3:47:04 PM | A | DONE |
|
|
Rob- fire life saftey Phone #: ###-####
|
BLD08-00127
| FIRE-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 2:36:13 PM | A | PASS |
|
|
Fire life safety inspection passed, HVAC unit duct detectors tested okay.
|
FIR07-00879
| INSP-Supply line flush | 6/9/2008 | 6/10/2008 | 6/10/2008 1:34:06 PM | A | PART |
|
|
UG fire supply line flush completed satisfactory.
|
FIR08-00301
| INSP-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 12:47:00 PM | P | PASS |
|
|
Scope of work is complete, fire sprinkler permit finaled.
|
FIR07-00879
| INSP-Sprinkler Rough-in/Hydro | 6/9/2008 | 6/10/2008 | 6/10/2008 12:43:43 PM | A | PART |
|
|
UG hydrostatic test passed.
|
BLD08-00895
| FIRE-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 12:41:29 PM | P | PASS |
|
|
C/N items verified for compliance, fire life safety finaled.
|
BLD08-00011
| FIRE-Final Inspection | 6/9/2008 | 6/10/2008 | 6/10/2008 12:40:13 PM | A | PASS |
|
|
Correction notice items per previous fire life safety inspection are finished, racking has been removed, one exit sign at the office repaired while on site, inspection passed. NOTE: Contractor has misplaced the request for occupancy signature card-not available on site for sign off.
|
BLD07-02391
| FIRE-Final Inspection | 6/9/2008 | 6/10/2008 | 6/10/2008 12:35:48 PM | A | PART |
|
|
The exit sign/EM light and PFE have been installed per correction notice, final pending plan modification for now unfinished portions of the building including the east HVAC duct detector which is not powered at this time.
|
FIR08-00281
| INSP-Sprinkler Rough-in | 6/9/2008 | 6/10/2008 | 6/10/2008 12:32:44 PM | A | PART |
|
|
UG fire supply line, PIV, remote FDC piping and ductile stub in at the riser are okay for cover, portions of piping already concealed were uncovered and exposed on site per request, line bedding is acceptable.
|