Inspections for the day of: Tuesday, June 10, 2008.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01179 BLD-Footing6/9/20086/10/20086/11/2008 7:26:27 AMPPASS
Scheduled by a contractor via Hello! on 6/9/2008 at 9:59:41 AM. Contact: ###-####.
BLD08-00538 BLD-Framing/Rough-in6/9/20086/10/20086/11/2008 7:26:12 AMPPASS
Ernie Phone #: ###-#### ok to insulate
BLD06-01451 BLD-Conference6/10/20086/10/20086/11/2008 7:25:41 AMPPART
Dave; Can you,me,and my steel fabricator meet at the jobsite at 2pm +- to discuss the code concerning the bolts used in the steel decks?He has a couple questions. Let me know what time works. Thanks, Bob Phone #: ###-#### Internet Inspection Request from: bob austin talked about connections of decks to bluiding will get engineer to reveiw
BLD08-00838 BLD-Footing6/9/20086/10/20086/10/2008 3:11:44 PMAPASS
Scheduled by a contractor via Hello! on 6/9/2008 at 10:01:46 PM. Contact: ###-####.
ESC08-00342 Site Preparation6/10/20086/10/20086/10/2008 3:11:30 PMPPASS
all looks good
BLD08-00536 BLD-Final6/10/20086/10/20086/10/2008 3:08:46 PMPCANC
jade Phone #: ###-####
BLD07-02331 BLD-Final6/9/20086/10/20086/10/2008 3:02:25 PMPPASS
Greg Phone #: ###-#### ok for perm occ
ESC07-01142 DOC - Permit Finaled6/10/20086/10/20086/10/2008 3:01:33 PMPPASS
ESC07-01142 Site Final6/10/20086/10/20086/10/2008 3:01:23 PMPPASS
BLD06-02303 BLD-Final6/10/20086/10/20086/10/2008 3:00:50 PMPPASS
brad - ###-#### - 14th floor
BLD06-01592 BLD-Final6/9/20086/10/20086/10/2008 11:39:20 AMAPASS
Harry- call for access Phone #: ###-####
BLD06-01592 DOC - Permit Finaled6/10/20086/10/20086/10/2008 11:39:10 AMPPASS
ESC06-00943 Site Preparation6/10/20086/10/20086/10/2008 10:26:05 AMPCANC
ESC06-00943 Site Final6/10/20086/10/20086/10/2008 10:25:57 AMPPASS
ESC06-00943 DOC - Permit Finaled6/10/20086/10/20086/10/2008 10:25:43 AMPPASS
BLD07-00855 BLD-Final6/9/20086/10/20086/10/2008 9:14:26 AMAFAIL
Corey Phone #: ###-#### needs other trades to final
BLD07-00855 BLD-Energy code compliance6/9/20086/10/20086/10/2008 9:13:15 AMAPASS
Corey Phone #: ###-####
BLD07-00855 BLD-Framing/Rough-in6/9/20086/10/20086/10/2008 9:12:59 AMAPASS
Corey Phone #: ###-####
BLD08-01228 BLD-Footing6/9/20086/10/20086/10/2008 8:38:12 AMADONE
Greg Phone #: ###-####