BLD08-01003
| FIRE-Conference | 6/10/2008 | 6/10/2008 | 6/11/2008 3:42:38 PM | P | DONE |
|
|
I went over project phasing with Mark.
|
FIR08-00389
| INSP-Final Inspection | 6/10/2008 | 6/10/2008 | 6/11/2008 12:27:14 PM | P | PASS |
|
|
Permit finaled
|
BLD08-01165
| FIRE-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 4:45:11 PM | P | PASS |
|
|
life safety passed
|
BLD05-01602
| FIRE-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 3:31:50 PM | P | PASS |
|
|
Fire life safety passed.
|
FIR07-00999
| INSP-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 3:30:55 PM | P | PASS |
|
|
permit finaled
|
FIR07-00999
| INSP-Alarm Testing | 6/9/2008 | 6/10/2008 | 6/10/2008 3:30:21 PM | P | PASS |
|
|
Permit finaled
|
FIR07-00886
| INSP-Final Inspection | 6/9/2008 | 6/10/2008 | 6/10/2008 1:34:28 PM | P | PASS |
|
|
Permit finaled
|
BLD08-01007
| FIRE-Final Inspection | 6/9/2008 | 6/10/2008 | 6/10/2008 1:31:22 PM | A | PART |
|
|
A temporary occupancy was given with Mark Sentenno's permission until the remaining insulation issues in the strip mall have been addressed by Oppenhiemer Development.
|
FIR07-00874
| INSP-Sprinkler Rough-in | 6/9/2008 | 6/10/2008 | 6/10/2008 1:29:01 PM | A | DONE |
|
|
This inspection was actually for a conference regarding the light fixtures blocking the pendant sprinkler spray. Grinnell did not show up for the conference but the superintendant for Petra was there and he made a copy of the Beam Rule spacing chart in NFPA 13 cahpter 8. We measured a couple of heads so that he knew what I was looking at.
|
FIR07-00309
| INSP-Sprinkler Rough-in/Hydro | 6/9/2008 | 6/10/2008 | 6/10/2008 12:41:01 PM | A | PASS |
|
|
Rough-in passed except a pendant head in the upper floor restroom is blocked by a stub wall. Will need a separate inspection when the tenting is done. Nick Anderson provided revised hydraulic calculations for the side wall head in the lower level bedroom #2 proving it could be spaced in the 6" top 12" window.
|
FIR08-00115
| FIR-Aging Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 10:33:02 AM | | NR |
|
|
work is in progress
|
BLD08-00125
| FIRE-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 10:03:54 AM | P | PASS |
|
|
fire life safety passed
|
FIR08-00231
| INSP-Final Inspection | 6/9/2008 | 6/10/2008 | 6/10/2008 10:03:18 AM | A | PASS |
|
|
Permit finaled
|
FIR08-00396
| INSP-Final Inspection | 6/9/2008 | 6/10/2008 | 6/10/2008 7:41:25 AM | A | PASS |
|
|
Permit finaled
|
FIR08-00358
| INSP-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 12:00:00 AM | P | CANC |
|
|
ben Phone #: ###-####
|