Inspections for the day of: Wednesday, June 10, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00103 INSP-Conference6/10/20096/10/20096/11/2009 4:19:16 PMPDONE
Regarding site test schedule.
FIR09-00275 INSP-Final Inspection6/10/20096/10/20096/11/2009 4:18:39 PMPNR
Plans have not been provided to indicate location of permit work, contractor to verifiy if pre-test has been done, mag locks must be engaged to confirm drop out.
BLD07-01692 FIRE-Conference6/10/20096/10/20096/10/2009 12:56:53 PMADONE
FIR07-00827 Phone #: ###-#### Internet Inspection Request from: Phil Doble NOTE: permit # FIR08-00776 still in the "issued status" as project attatched.
BLD06-02762 FIRE-Conference6/10/20096/10/20096/10/2009 12:55:10 PMADONE
FIR07-00086 Phone #: ###-#### Internet Inspection Request from: Phil Doble
BLD09-00329 FIRE-Final Inspection6/10/20096/10/20096/10/2009 11:49:37 AMPPASS
Fire life safety completed satisfactory.
FIR09-00141 FIR-Aging Inspection6/10/20096/10/20096/10/2009 11:47:44 AM DONE
Work in progress
FIR09-00104 INSP-Sprinkler Rough-in6/9/20096/10/20096/10/2009 11:46:54 AMAPART
Overhead fire sprinkler system modifications are approved for cover at the grid ceilings in the chemo expansion room area as marked and initialed on plan set.
BLD08-02564 FIRE-Final Inspection6/9/20096/10/20096/10/2009 11:44:53 AMAPASS
Life safety inspection passed, contractor to post building address numbers as discussed prior to structural final approval.