FIR09-00103
| INSP-Conference | 6/10/2009 | 6/10/2009 | 6/11/2009 4:19:16 PM | P | DONE |
|
|
Regarding site test schedule.
|
FIR09-00275
| INSP-Final Inspection | 6/10/2009 | 6/10/2009 | 6/11/2009 4:18:39 PM | P | NR |
|
|
Plans have not been provided to indicate location of permit work, contractor to verifiy if pre-test has been done, mag locks must be engaged to confirm drop out.
|
BLD07-01692
| FIRE-Conference | 6/10/2009 | 6/10/2009 | 6/10/2009 12:56:53 PM | A | DONE |
|
|
FIR07-00827 Phone #: ###-#### Internet Inspection Request from: Phil Doble NOTE: permit # FIR08-00776 still in the "issued status" as project attatched.
|
BLD06-02762
| FIRE-Conference | 6/10/2009 | 6/10/2009 | 6/10/2009 12:55:10 PM | A | DONE |
|
|
FIR07-00086 Phone #: ###-#### Internet Inspection Request from: Phil Doble
|
BLD09-00329
| FIRE-Final Inspection | 6/10/2009 | 6/10/2009 | 6/10/2009 11:49:37 AM | P | PASS |
|
|
Fire life safety completed satisfactory.
|
FIR09-00141
| FIR-Aging Inspection | 6/10/2009 | 6/10/2009 | 6/10/2009 11:47:44 AM | | DONE |
|
|
Work in progress
|
FIR09-00104
| INSP-Sprinkler Rough-in | 6/9/2009 | 6/10/2009 | 6/10/2009 11:46:54 AM | A | PART |
|
|
Overhead fire sprinkler system modifications are approved for cover at the grid ceilings in the chemo expansion room area as marked and initialed on plan set.
|
BLD08-02564
| FIRE-Final Inspection | 6/9/2009 | 6/10/2009 | 6/10/2009 11:44:53 AM | A | PASS |
|
|
Life safety inspection passed, contractor to post building address numbers as discussed prior to structural final approval.
|