Inspections for the day of: Thursday, June 10, 2010.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR10-00263 INSP-Final Inspection6/10/20106/10/20106/10/2010 3:59:28 PMPCANC
Canceled due to time constraints and Micron plan review.
BLD09-00323 FIRE-Final Inspection6/9/20106/10/20106/10/2010 3:36:44 PMPCANC
Canceled due to time constraints. Rescheduled for tomorrow morning.
FIR10-00146 INSP-Sprinkler Rough-in6/10/20106/10/20106/10/2010 11:13:25 AMPFAIL
Sprinkler heads are overspaced and the installation doesn't match plasn. Per Jeff Packam this project was not ready for inspection. I also found an existing deluge valve that is not connected to the fire alarm system and is missing an air compressor. I let the general contractor, Camco, know that this equipment needs to be functional prior to any sign offs for his permit.
BLD10-00814 FIRE-Final Inspection6/10/20106/10/20106/10/2010 11:06:19 AMPPASS
Life safety passed.
FIR05-00727 INSP-Conference6/2/20106/10/20106/10/2010 10:45:13 AMADONE
Per Joan the electrical work has been scheduled. She will call with a follow up status shortly.
FIR04-00655 INSP-Conference6/3/20106/10/20106/10/2010 10:39:55 AMADONE
Bill has not been able to sent a tech out yet. He will try again. Follow up inspection set up for next week.
BLD09-01903 FIRE-Final Inspection6/10/20106/10/20106/10/2010 10:13:26 AMAPASS
Life safety passed.
BLD10-01233 FIRE-Final Inspection6/9/20106/10/20106/10/2010 8:53:50 AMACANC
Wrong inspector called for inspection.
FIR10-00211 INSP-Sprinkler Rough-in6/9/20106/10/20106/10/2010 8:44:41 AMAFAIL
I left two messages on Lonnie's voice mail and went to the job site but did not make contact. No inspection was performed and will need to be recalled.