FIR10-00263
| INSP-Final Inspection | 6/10/2010 | 6/10/2010 | 6/10/2010 3:59:28 PM | P | CANC |
|
|
Canceled due to time constraints and Micron plan review.
|
BLD09-00323
| FIRE-Final Inspection | 6/9/2010 | 6/10/2010 | 6/10/2010 3:36:44 PM | P | CANC |
|
|
Canceled due to time constraints. Rescheduled for tomorrow morning.
|
FIR10-00146
| INSP-Sprinkler Rough-in | 6/10/2010 | 6/10/2010 | 6/10/2010 11:13:25 AM | P | FAIL |
|
|
Sprinkler heads are overspaced and the installation doesn't match plasn. Per Jeff Packam this project was not ready for inspection. I also found an existing deluge valve that is not connected to the fire alarm system and is missing an air compressor. I let the general contractor, Camco, know that this equipment needs to be functional prior to any sign offs for his permit.
|
BLD10-00814
| FIRE-Final Inspection | 6/10/2010 | 6/10/2010 | 6/10/2010 11:06:19 AM | P | PASS |
|
|
Life safety passed.
|
FIR05-00727
| INSP-Conference | 6/2/2010 | 6/10/2010 | 6/10/2010 10:45:13 AM | A | DONE |
|
|
Per Joan the electrical work has been scheduled. She will call with a follow up status shortly.
|
FIR04-00655
| INSP-Conference | 6/3/2010 | 6/10/2010 | 6/10/2010 10:39:55 AM | A | DONE |
|
|
Bill has not been able to sent a tech out yet. He will try again. Follow up inspection set up for next week.
|
BLD09-01903
| FIRE-Final Inspection | 6/10/2010 | 6/10/2010 | 6/10/2010 10:13:26 AM | A | PASS |
|
|
Life safety passed.
|
BLD10-01233
| FIRE-Final Inspection | 6/9/2010 | 6/10/2010 | 6/10/2010 8:53:50 AM | A | CANC |
|
|
Wrong inspector called for inspection.
|
FIR10-00211
| INSP-Sprinkler Rough-in | 6/9/2010 | 6/10/2010 | 6/10/2010 8:44:41 AM | A | FAIL |
|
|
I left two messages on Lonnie's voice mail and went to the job site but did not make contact. No inspection was performed and will need to be recalled.
|