Inspections for the day of: Friday, June 10, 2011.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-02285 FIRE-Final Inspection6/9/20116/10/20116/10/2011 2:34:33 PMAFAIL
Provide single action hardware on all of the doors including the north east exterior exit door and provide a fire extinguisher as discussed.
BLD09-02285 FIRE-Conference6/9/20116/10/20116/10/2011 2:04:35 PMADONE
Provide single action hardware on all of the doors including the north east exterior exit door and provide a fire extinguisher as discussed.
BLD11-00152 FIRE-Final Inspection6/10/20116/10/20116/10/2011 1:48:04 PMPPASS
life safety passed
BLD11-00616 FIRE-Final Inspection6/8/20116/10/20116/10/2011 11:17:02 AMAPASS
life safety passed
FIR11-00268 INSP-Final Inspection6/9/20116/10/20116/10/2011 11:16:39 AMAPASS
Permit finaled
BLD11-01186 FIRE-Supply Line Hydro6/9/20116/10/20116/10/2011 9:58:19 AMAFAIL
Provide single action hardware, remove deadbolt, on one of the main lobby exit doors. The one that is to remain keyed to be provide with sticker. Provide single action hardware, remove deadbolt, on the warehouse door. Provide fire extinguishers with current inspection tags as discussed. This includes one mounted on the mezzanine.
BLD09-00511 FIRE-Final Inspection6/9/20116/10/20116/10/2011 9:56:02 AMAPASS
life safety passed
BLD11-00934 FIRE-Final Inspection6/9/20116/10/20116/10/2011 9:05:09 AMAPASS
life safety passed.