ELE11-02617
| ELE-Aging Inspection | 6/10/2013 | 6/10/2013 | 6/10/2013 4:22:05 PM | | DONE |
|
|
waiting on owner
|
ELE12-01710
| Electrical Rough-In | 6/10/2013 | 6/10/2013 | 6/10/2013 4:01:17 PM | P | PASS |
|
|
Contact: Wes Powell - wall rough-in please Phone #: ###-#### >> Inspection requested via web by Deb Gooden North stairs floors 15&16, Floor 16 bathrooms rough in ok cover
|
ESC13-00527
| Site Preparation | 6/10/2013 | 6/10/2013 | 6/10/2013 2:52:22 PM | | PASS |
|
|
Sign posted, demo contained
|
ELE13-00250
| Final | 6/10/2013 | 6/10/2013 | 6/10/2013 2:30:33 PM | P | FAIL |
|
|
Key Code 3636 Phone #: ###-#### >> Inspection requested via web by cal crosby 408.4- Circuit directory- Label garage circuit in meter main. 110.22(A)- Identification of disconnecting means- identify garage disconnect switch and ac disconnects. 440.12(A)- Overcurrent device shall be sized to the name plate rating. 20a on a 15a max ac. 342.30(A)- Service mast shall be secured with in 3' of meter base. Wrong number given on ispection request.
|
ELE13-00388
| Final | 6/10/2013 | 6/10/2013 | 6/10/2013 1:24:47 PM | P | PASS |
|
|
Call Shane before arriving and he will meet you there. Thank you. Phone #: ###-#### >> Inspection requested via web by Eric Brown Final ok
|
ELE13-01440
| Permanent Service | 6/10/2013 | 6/10/2013 | 6/10/2013 12:41:01 PM | P | CANC |
|
|
George Phone #: ###-#### needed temp service
|
ELE13-01440
| Temporary Service | 6/10/2013 | 6/10/2013 | 6/10/2013 12:40:35 PM | P | PASS |
|
|
George Phone #: ###-#### t/s u/g n ok
|
ELE13-01442
| Temporary Service | 6/8/2013 | 6/10/2013 | 6/10/2013 12:11:38 PM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by mike brown t/s u/g n ok
|
ESC13-00538
| Site Preparation | 6/10/2013 | 6/10/2013 | 6/10/2013 10:37:20 AM | | PASS |
|
|
No activity
|
ELE13-01431
| Electrical Rough-In | 6/7/2013 | 6/10/2013 | 6/10/2013 10:32:44 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Barbara Szurgot Kitchen refer wall and stair wall rough in ok cover
|
ELE12-03075
| Conference | 6/10/2013 | 6/10/2013 | 6/10/2013 10:21:47 AM | A | CANC |
|
|
2 upstairs bath floor heat Phone #: ###-#### >> Inspection requested via web by Darrin Bybee Needed rough in insp.
|
ELE12-03075
| Electrical Rough-In | 6/10/2013 | 6/10/2013 | 6/10/2013 10:21:30 AM | P | PASS |
|
|
2 upstairs bath floor heat Phone #: ###-#### >> Inspection requested via web by Darrin Bybee Master bath floor heat rough in ok cover
|
ELE13-01134
| Final | 6/10/2013 | 6/10/2013 | 6/10/2013 9:49:37 AM | A | NH |
|
|
PLEASE CALL AT LEAST 1/2 HOUR BEFORE ARRIVING AT JOB SITE. Phone #: ###-#### >> Inspection requested via web by PAUL PINNEY Locked no access
|
ELE12-02148
| Electrical Rough-In | 6/10/2013 | 6/10/2013 | 6/10/2013 9:31:12 AM | A | PASS |
|
|
ground work on the gazebo and ground rods for the sub panel . all pipes will be coverd with 4 inchs of concret Phone #: ###-#### >> Inspection requested via web by Erick Baker Underground and service grounding rough in ok cover
|
ELE13-01438
| Final | 6/10/2013 | 6/10/2013 | 6/10/2013 8:46:44 AM | P | PASS |
|
|
Final ok
|
ELE13-01446
| Final | 6/10/2013 | 6/10/2013 | 6/10/2013 12:00:00 AM | P | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Mike Cole
|