BLD13-03210
| FIRE-Final Inspection | 6/10/2014 | 6/10/2014 | 6/11/2014 1:11:41 PM | P | PASS |
|
|
life safety passed. Scott and Craig approved the foam.
|
FIR14-00287
| INSP-Sprinkler Rough-in/Hydro | 6/10/2014 | 6/10/2014 | 6/10/2014 2:50:42 PM | P | CANC |
|
|
Wrong permit number called in. Overhead permit needed.
|
FIR13-00723
| INSP-Sprinkler Rough-in | 6/9/2014 | 6/10/2014 | 6/10/2014 2:09:57 PM | A | PASS |
|
|
See the city approved plans for location marked "ok" for piping that is ok for cover.
|
BLD14-00778
| FIRE-Final Inspection | 6/9/2014 | 6/10/2014 | 6/10/2014 10:36:10 AM | A | PASS |
|
|
Life safety passed.
|
FIR12-00737
| FIR-Aging Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 8:12:45 AM | | NR |
|
|
Jeff with TVFP and I spoke about job status. It appears there may be changes required based on activities with BLD13-00166. Jeff is going to follow up on these changes and get back to me.
|