ESC14-00211
| Complaint Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 5:07:19 PM | P | PEND |
|
|
Lusk Place project is grubbing and preliminary grading the site with valid permit. The drainage channel against the bench is to be covered and put under ground.
There was a concern of lack of BMPs for activities related to the drainage ditch and turbid-sediment laden water being sent downstream.
I inspected the site with RP Jose from McAlvain. He has set up a series of 4 settling chambers on sections of the ditch to settle out sediment while operations are occuring. The chambers are made with rock and filter fabric, and some gatorguards weighed down by rocks.
No background turbidity for the ditch is possible, however Jose is to take a turbidity sample tomorrow morning. Need to check into destination of ditch.
|
ESC14-00215
| General Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 4:58:16 PM | | CANC |
|
|
rescheduled for 6/11
|
ESC14-00250
| General Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 4:46:43 PM | | PASS |
|
|
Site in good condition. Rear silt fence, construction access, and washout all approved.
|
ESC13-01167
| General Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 3:03:00 PM | | CANC |
|
|
rescheduled for 6/11
|
ESC13-01222
| DOC - Permit Finaled | 6/10/2014 | 6/10/2014 | 6/10/2014 3:01:53 PM | P | PASS |
|
|
|
ESC13-01222
| General Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 3:01:46 PM | | PASS |
|
|
All exterior work is complete. Inside is half open and BLD permit is not yet finaled. No further ESC inspections required.
|
ESC13-00485
| General Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 2:45:22 PM | | PASS |
|
|
Owyhee renovation is in compliance. Streets and gutters surrounding project are clean and storm drain inlets have protection. No corrections.
|
ESC13-00628
| Aging Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 2:29:24 PM | | PASS |
|
|
Finaled.
|
ESC13-00628
| DOC - Permit Finaled | 6/10/2014 | 6/10/2014 | 6/10/2014 2:29:12 PM | P | PASS |
|
|
ESC conditions satisfied. Going to have Tahoe clean up lots on Honeycomb and Wolftree. Other than that Honeycomb parcels are complete.
|
ESC13-00635
| Aging Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 2:18:21 PM | | PASS |
|
|
Finaled.
|
ESC13-00635
| DOC - Permit Finaled | 6/10/2014 | 6/10/2014 | 6/10/2014 2:18:09 PM | P | PASS |
|
|
ESC conditions satisfied. Home is complete and permits finaled.
|
ESC13-00639
| Aging Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 2:16:31 PM | | PASS |
|
|
Finaled.
|
ESC13-00639
| DOC - Permit Finaled | 6/10/2014 | 6/10/2014 | 6/10/2014 2:16:20 PM | P | PASS |
|
|
House complete and landscaped. BLD permit finaled. ESC conditions satisfied.
|
ESC14-00420
| Site Preparation | 6/10/2014 | 6/10/2014 | 6/10/2014 2:07:03 PM | P | PASS |
|
|
Permit posted. Mill District Square stormwater structures and BMPs in good condition. Approved for construction.
|
ESC14-00440
| Site Preparation | 6/10/2014 | 6/10/2014 | 6/10/2014 2:04:56 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Joshua Edwards
Inspection already conducted and has been excavatied. No violations. Intended for ESC14-00420 (also on Woodcarver)
|
ESC14-00388
| Site Preparation | 6/10/2014 | 6/10/2014 | 6/10/2014 12:26:14 PM | P | PASS |
|
|
Jesse Phone #: ###-####
Work includes updating accessibility ramps at Macy's entrance's and some parking lot repair. DI bags have been placed in stormwater drains with project area. Housekeeping will be main BMP. Low risk for sediment migration off site..
|
ESC13-00464
| Aging Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 11:51:24 AM | | PASS |
|
|
Project near completion. Front yard berm is not yet stabilized. No ESC issues.
|
ESC13-00302
| General Inspection | 6/9/2014 | 6/10/2014 | 6/10/2014 11:36:26 AM | A | PASS |
|
|
rescheduled from 6/9
WIP. Permit posted. No activity at time of inspecion. Gutter and street in front of home are clean. No corrections.
|
ESC14-00115
| General Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 11:11:13 AM | | PASS |
|
|
Finaled.
|
ESC14-00115
| DOC - Permit Finaled | 6/10/2014 | 6/10/2014 | 6/10/2014 11:11:03 AM | P | PASS |
|
|
All exterior disturbance that may have occured has been stabilized. BLD permit finaled. No ESC issues or non-stormwater discharges observed at Craig Stein Beverage.
|
ESC14-00247
| Site Preparation | 6/10/2014 | 6/10/2014 | 6/10/2014 11:03:02 AM | P | PASS |
|
|
Jamie Phone #: ###-####
See general inspection notes. Discussed project with Jamie for CA Paving. Project is approved to continue.
|
ESC14-00247
| General Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 10:57:04 AM | | PASS |
|
|
Owyhee Terraces private lane repaving project is in project. Permit posted at front entrance off Owyhee St. Breaking asphalt into chunks and hauling. Working in phases. No discharges or sediment issues observed. All drainage to grassy swales.
|
ESC13-00322
| Aging Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 10:39:16 AM | | PASS |
|
|
No disturbance or acitivity observed at site. Last activity on BLD permit was December 2013. Next inspection, if no activity, permit will be expired.
|
ESC13-01263
| Random Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 10:32:07 AM | P | PASS |
|
|
Verified that berm along the east side of project has been hydroseeded/stabilized as discussed with CM company the previous week. No dust or trackout related to project. Will soon be pouring the tennis courts. No corrections.
|
ESC13-01174
| DOC - Permit Finaled | 6/10/2014 | 6/10/2014 | 6/10/2014 10:26:01 AM | P | PASS |
|
|
BK Accessory storage for softball/ baseball has been completed and surrounding areas cleaned/stabilized. All associated permits finaled. ESC conditions satisfied.
|
ESC14-00036
| General Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 10:23:55 AM | | PASS |
|
|
Addition frame has been built. Interior work ongoing. Concurrent parking lot and tennis court project is covered under ESC13-01263. Sediment and construction materials confined to site. No corrections required.
|
ESC14-00200
| General Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 10:00:36 AM | | PASS |
|
|
Permit posted and SWPPP binder at entrance. Completed inspection reports are kept inside the job trailer. No significant track out or dust. No corrections at this time. Discussed project with RP Berne who was onsite.
|
ESC13-01159
| Random Inspection | 6/10/2014 | 6/10/2014 | 6/10/2014 9:36:58 AM | P | PASS |
|
|
Working on stormwater swales and rerouting canal channel. No trackout, permit posted. Need to investigate scope of channel re-routing; may need to improve buffer and silt fencing on north perimeter.
|
ESC13-00128
| General Inspection | 6/9/2014 | 6/10/2014 | 6/10/2014 9:19:48 AM | A | PASS |
|
|
make up from 6/9
WIP. Permit posted on fence. Site is graded that drainage/sheet flow goes to center of lot. Street and sidewalks are clean. No corrections at this time.
|
ESC14-00498
| Site Preparation | 6/9/2014 | 6/10/2014 | 6/10/2014 8:30:31 AM | A | PASS |
|
|
Marc Phone #: ###-####
|