ELE15-01716
| Rough-In Permanent Service | 6/9/2015 | 6/10/2015 | 6/10/2015 2:54:12 PM | P | PASS |
|
|
Need ok for Idaho Power to reconnect service. Late afternoon please. Phone #: ###-#### Inspection requested via web by Randy Fletcher r/i ok new 4 wire romex and devices to range and dryer and existing sub panel. p/s o/h rec ok
|
ELE14-02195
| Final | 6/10/2015 | 6/10/2015 | 6/10/2015 2:17:32 PM | P | FAIL |
|
|
This will be a final for this permit. If you can - we are requesting this for a late afternoon inspection if possible. Please call Kyle Little ###-#### 30 minutes prior to arriving. Thank you and have a super day! Phone #: ###-#### Inspection requested via web by Laura Longshaw 210.8(B)(2)- all 120 volt receptacles in other than dwelling kitchen shall have GFCI protection. juke box and reach in fridge have no power. Panel directories needed and old panel needs arc flash warning sticker.
|
ELE15-00956
| Final | 6/10/2015 | 6/10/2015 | 6/10/2015 1:20:34 PM | P | PART |
|
|
Shane is the contact his cell is ###-#### Phone #: ###-#### Inspection requested via web by Shawna Gates did final inspection, some light fixtures in teller area still need to be installed and arc flash stickers on panels. Gave temp. occupancy
|
ELE15-01724
| Permanent Service | 6/9/2015 | 6/10/2015 | 6/10/2015 12:36:13 PM | P | PASS |
|
|
Call 1/2 hr. prior to inspection. Phone #: ###-#### Inspection requested via web by MIKE HAGERTY p/s o/h rec ok
|
ELE15-01724
| Final | 6/10/2015 | 6/10/2015 | 6/10/2015 12:35:34 PM | P | PASS |
|
|
Call 1/2 hr. prior to inspection. Phone #: ###-#### Inspection requested via web by MIKE HAGERTY final ok
|
ELE14-03335
| Electrical Rough-In | 6/10/2015 | 6/10/2015 | 6/10/2015 12:11:57 PM | P | PASS |
|
|
Contact: Jeremy Thornock Phone #: ###-#### Inspection requested via web by Deb Gooden r/i ok level 2 and 3 ceilings
|
ELE14-03334
| Electrical Rough-In | 6/10/2015 | 6/10/2015 | 6/10/2015 12:10:15 PM | P | PASS |
|
|
Contact: Jeremy Thornock Phone #: ###-#### Inspection requested via web by Deb Gooden r/i ok level 2 and 3 corridor ceilings
|
ELE12-01786
| ELE-Aging Inspection | 6/10/2015 | 6/10/2015 | 6/10/2015 10:08:36 AM | | DONE |
|
|
Burnese said she will call it in for final
|
ELE13-00618
| ELE-Aging Inspection | 6/10/2015 | 6/10/2015 | 6/10/2015 10:04:30 AM | | DONE |
|
|
left message to call for final
|
ELE14-01963
| Electrical Rough-In | 6/10/2015 | 6/10/2015 | 6/10/2015 10:01:30 AM | A | PASS |
|
|
Parking garage ceiling. Phone #: ###-#### Inspection requested via web by Rafael Castillo parking garage ceiling insulation above t grid ok Note: concerned about unit heaters in ceiling cavity blowing directly on rows of feeders. asked Rafael to see about getting them relocated.
|
ELE14-03246
| Electrical Rough-In | 6/8/2015 | 6/10/2015 | 6/10/2015 9:34:04 AM | A | PASS |
|
|
Levi. Tower #4 Floors 3rd - 4th Phone #: ###-#### Inspection requested via web by Sean DeLacy r/i 4th floor drop ceilings or soffits and south trash rm. ceiling ok
|
ELE15-02082
| Electrical Rough-In | 6/9/2015 | 6/10/2015 | 6/10/2015 12:00:00 AM | A | PASS |
|
|
Ceiling inspection for Skywest. Contact Jon Novak. Phone #: ###-#### Inspection requested via web by Cathy Duchek r/i t bar ceilings west ok
|