Inspections for the day of: Wednesday, June 10, 2015.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-01784 FIRE-Conference6/10/20156/10/20156/10/2015 3:35:24 PMPDONE
Kurt and I discussed life safety items. It appears the new walls are not going to effect the exisitng sprinkler coverage
BLD15-01147 FIRE-Final Inspection6/9/20156/10/20156/10/2015 2:43:50 PMPPASS
life safety passed
FIR15-00064 INSP-Alarm Testing6/9/20156/10/20156/10/2015 2:29:43 PMPDONE
Todays testing was for the hvac shut down on the first floor only. See the city approved plans for locations marked ok. Will need to test the detector over the security desk and the dampers/separation between floors when installed.
FIR15-00359 INSP-Supply line flush6/10/20156/10/20156/10/2015 2:24:37 PMPCANC
United Water has not turned on the water
FIR15-00360 INSP-Supply line flush6/10/20156/10/20156/10/2015 2:21:40 PMPCANC
This is a flush request. Colton is the contact. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
FIR15-00318 INSP-Sprinkler Rough-in/Hydro6/10/20156/10/20156/10/2015 2:19:47 PMPPASS
The overhead hydro test passed
FIR15-00318 INSP-Supply line flush6/9/20156/10/20156/10/2015 2:18:36 PMPPASS
The underground flush passed
FIR15-00309 INSP-Supply line flush6/10/20156/10/20156/10/2015 2:17:45 PMPPASS
Underground flush passed
FIR15-00256 INSP-Supply line flush6/10/20156/10/20156/10/2015 2:15:52 PMPPASS
Underground flush passed
FIR15-00405 INSP-Final Inspection6/10/20156/10/20156/10/2015 12:39:35 PMAPASS
Permit finaled
BLD15-01204 FIRE-Conference6/9/20156/10/20156/10/2015 11:25:59 AMADONE
Zach and I discussed life safety requirements. I noted that it appears the existing fire alarm notification devices need modification due to the wall layout. This work will require a permit. Zach would like a temporary so I deferred him to Romeo.
BLD14-03428 FIRE-Sprinkler Rough-in6/9/20156/10/20156/10/2015 9:30:46 AMADONE
Inspection was actually for a conference about the fire hydrant. The new fire hydrant has been installed too close to the side walk so that when the fence is installed the 3'-0" clearance can not be met. Also the 5" barrel is installed the wrong direction when the fence is installed. I ended up deferring Jake to Romeo for any variance.
FIR15-00221 INSP-Sprinkler Rough-in6/10/20156/10/20156/10/2015 9:04:24 AMPPASS
Underground Rough to cover passed. Piping can be covered
FIR15-00223 INSP-Sprinkler Rough-in6/10/20156/10/20156/10/2015 9:03:40 AMPPASS
Underground rough to cover passed. Piping can be covered
FIR15-00152 INSP-Final Inspection6/9/20156/10/20156/10/2015 8:50:54 AMAPASS
permit finaled
FIR12-00260 FIR-Aging Inspection6/10/20156/10/20156/10/2015 8:18:58 AM NR
It appears that work is in progress based on footing inspections.
BLD15-00955 FIRE-Final Inspection6/9/20156/10/20156/10/2015 8:16:04 AMAPASS
life safety passed
FIR14-00753 INSP-Sprinkler Rough-in/Hydro6/9/20156/10/20156/10/2015 7:26:51 AMAPASS
Overhead rough-in/tenting inspection complete. Piping can be covered. I spoke to Anderson Construction about making sure the tenting was not modified after I inspect. They were going to meet with the tenting contractor to verify