Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00727 INSP-Alarm Testing6/9/20156/10/20156/10/2015 3:56:28 PMPPART
Fire alarm system testing for Bldg. D commons area, including MP, SDs, CO detectors, heat detectors. One H/S unit in the kitchen area is not silencing properly.
No FSDs. or elevators tested this visit.
FIR14-00362 INSP-Sprinkler Rough-in/Hydro6/9/20156/10/20156/10/2015 3:53:57 PMAPASS
Boise PDS witnessed fire pump test (Tim Frost and Tom Walsh), incuding pump flow tests to record proper flows and pressures at various stages of the pump operations, also phase reversal, and fire alarm system interface.
All tested OK - final fire pump signoff will require room upgrades (1 hour room), including fire rated door installed, emergency lighting, wall penetrations fire stopped, etc. Also all weather sign on exterior of pump room door.
FIR14-00344 INSP-Sprinkler Rough-in/Hydro6/9/20156/10/20156/10/2015 3:49:22 PMACANC
Fire sprinkler final inspections will be conducted following completion of fire alarm system testing.
FIR14-00681 INSP-Sprinkler Rough-in/Hydro6/9/20156/10/20156/10/2015 3:47:53 PMACANC
Sprinkler final inspection/sign off will be conducted after all fire alarm testing is completed.
FIR14-00531 INSP-Sprinkler Rough-in6/9/20156/10/20156/10/2015 3:46:07 PMPPART
Rough to cover unit soffits for 3rd floor tower 4 section, including units 300 thru 305.
OK to cover the soffits in these units.
FIR15-00096 INSP-Sprinkler Rough-in6/9/20156/10/20156/10/2015 3:44:13 PMAPART
Rough to cover inspection for unit soffits of 3rd floor west, including units 326, 327, 328, 329, 330, 332, 335, 339, 337, 336, 338, 339, 340 and 341.
OK to cover soffits for these units.
FIR14-00365 INSP-Sprinkler Rough-in/Hydro6/10/20156/10/20156/10/2015 3:40:48 PMPCANC
Wrong permit # called in for this inspection. Will add inspection to the correct permit # FIR13-00275
FIR13-00167 INSP-Sprinkler Rough-in6/9/20156/10/20156/10/2015 2:22:34 PMPCANC
This is an underground to cover inspection. Concrete to arrive at 11:30am. We request a 12pm or 12:30pm inspection. Bryan is the contact for scheduling. Thanks. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus